Annual Report and Accounts 2012 - Speedy Hire plc
Annual Report and Accounts 2012 - Speedy Hire plc
Annual Report and Accounts 2012 - Speedy Hire plc
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
3<br />
2<br />
4<br />
Thames Water<br />
<strong>Speedy</strong> is a strategic partner of Thames<br />
Water, having secured a five-year<br />
framework agreement to supply plant <strong>and</strong><br />
equipment to their contractor base<br />
working on the AMP5 capital investment<br />
programme. <strong>Speedy</strong> supplies a wide<br />
range of equipment – from pneumatic<br />
tools to lighting equipment – <strong>and</strong> provides<br />
all contractors with a dedicated hire desk,<br />
specialist depots <strong>and</strong> access to <strong>Speedy</strong>’s<br />
market-leading extranet system to better<br />
manage their hire needs online.<br />
Veolia<br />
<strong>Speedy</strong> has been awarded a preferred<br />
supplier agreement to provide<br />
equipment <strong>and</strong> hire support to Veolia<br />
in the UK <strong>and</strong> Irel<strong>and</strong>. The contract is<br />
a three plus two-year award to supply<br />
tools, lifting, survey, access, pumps,<br />
generators, compressors, engineering<br />
<strong>and</strong> plant to Veolia, which engages in<br />
providing water <strong>and</strong> wastewater<br />
services, environmental services <strong>and</strong><br />
energy services.<br />
National Decommissioning<br />
Authority<br />
<strong>Speedy</strong> secured a three-year agreement<br />
in 2011 to supply lifting consumables to<br />
the nuclear processing sites at Sellafield,<br />
Magnox <strong>and</strong> Dounreay <strong>and</strong> to the remaining<br />
Nuclear Decommissioning Authority estate.<br />
Through the agreement, <strong>Speedy</strong> supplies<br />
all of the lifting equipment necessary to<br />
undertake maintenance at the sites <strong>and</strong><br />
provides on-site support for employees in<br />
addition to testing, inspecting <strong>and</strong> repair<br />
work on lifting equipment on site.<br />
Crossrail<br />
water<br />
Energy<br />
Business review 09<br />
Waste<br />
<strong>Speedy</strong> supports Crossrail’s tier 1 <strong>and</strong> tier<br />
2 contractors, providing equipment <strong>and</strong><br />
services for the major projects being<br />
delivered as part of the construction<br />
programme. <strong>Speedy</strong> supplies a wide range<br />
of equipment, from large compressors to<br />
lifting solutions, provides contractors with<br />
specialist depots, ensures its vehicles<br />
comply with rail regulations <strong>and</strong> holds<br />
specific induction sessions for employees<br />
to gain accreditation <strong>and</strong> approval to<br />
appropriately support Crossrail’s contractors.<br />
<strong>Speedy</strong> <strong>Hire</strong> Plc <strong>Annual</strong> <strong>Report</strong> <strong>and</strong> <strong>Accounts</strong> <strong>2012</strong><br />
Transport<br />
Business review