- Page 1:
Independent Review of MSHA’s Acti
- Page 4 and 5:
Protective Ground Support Used Duri
- Page 7:
Location of March Bounce Last Known
- Page 10 and 11:
EXECUTIVE SUMMARY The Federal Mine
- Page 12 and 13:
• Persons who could have contribu
- Page 14 and 15:
There was no lack of hard work and
- Page 16 and 17:
BLM INSPECTIONS OF CRANDALL CANYON
- Page 18 and 19:
oxygen and dust into the fresh air
- Page 20 and 21:
MSHA’S ACTIONS PRIOR TO AUGUST 6,
- Page 22 and 23:
that the proposed retreat sequence
- Page 24 and 25:
On February 23, 2007, District 9 re
- Page 26 and 27:
technical guidance from someone exp
- Page 28 and 29:
District management’s oversight w
- Page 30 and 31:
elieved that a higher stability fac
- Page 32 and 33:
questions were asked in an attempt
- Page 34 and 35:
offset between crosscuts 139 and 14
- Page 36 and 37:
To determine the validity of the in
- Page 38 and 39:
disapproval to the District Manager
- Page 40 and 41:
amendments for the South Barrier re
- Page 42 and 43:
The following table contains certai
- Page 44 and 45:
The Price Field Office did not inve
- Page 46 and 47:
The inspector stated that this even
- Page 48 and 49:
conducted every seven days. However
- Page 50 and 51:
Recommendation: MSHA should establi
- Page 52 and 53:
DIRECTION AND ACTIVITIES DURING THE
- Page 54 and 55:
111-8, which was in effect at the t
- Page 56 and 57:
MSHA Person-In-Charge of Mine Rescu
- Page 58 and 59:
Davis stated that when Stickler and
- Page 60 and 61:
There was also no verification that
- Page 62 and 63:
employee stated, “Everybody got f
- Page 64 and 65:
Underground Phone Communication Sys
- Page 66 and 67:
PROTECTIVE GROUND SUPPORT USED DURI
- Page 68 and 69:
equipment to tram in and out of the
- Page 70 and 71:
Top of Rockprop Bottom of Rockprop
- Page 72 and 73:
Canyon the inby end of the ropes wa
- Page 74 and 75:
educed to writing and served to the
- Page 76 and 77:
planned to film the underground res
- Page 78 and 79:
Stickler stated that family members
- Page 80 and 81:
Conclusion: MSHA failed to enforce
- Page 82 and 83:
Later on August 6 th , a mine rescu
- Page 84 and 85:
anybody sit down with the MSHA peop
- Page 86 and 87:
EXPLORATIONS During the underground
- Page 88 and 89:
since the ribs could not further ex
- Page 90 and 91:
DRILLING OF BOREHOLES Boreholes pla
- Page 92 and 93:
pump for a period of time, the meas
- Page 94 and 95:
After this hole was drilled, MSHA
- Page 96 and 97:
The borehole showed there was no vo
- Page 98 and 99:
RISK VERSUS VALUE In all rescue and
- Page 100 and 101:
stoppings to crosscut 95 would also
- Page 102 and 103:
section were equipped with Self-Con
- Page 104 and 105:
data, the idea was not pursued any
- Page 106 and 107:
for an hour and one-half and then w
- Page 108 and 109:
sampling equipment to their truck a
- Page 110 and 111:
Agency. The handbook consisted of 9
- Page 112 and 113:
updates and briefings on the rescue
- Page 114 and 115:
Utah Governor Jon Huntsman, Jr., MS
- Page 116 and 117:
Stickler contradicting or correctin
- Page 118 and 119:
trapped miners should, to the exten
- Page 120 and 121:
Conclusion: The MSHA person-in-char
- Page 122 and 123: An attachment to the policy sets fo
- Page 124 and 125: air and water waiting for us to com
- Page 126 and 127: Davis did clarify that there was no
- Page 128 and 129: the family and press briefings, and
- Page 130 and 131: emergency with role-playing by all
- Page 132 and 133: MINER ACT AND MINE EMERGENCY EVACUA
- Page 134 and 135: Post-Accident Communications The MI
- Page 136 and 137: Recommendation: The Agency should d
- Page 138 and 139: At the time of the accident, the ER
- Page 140 and 141: locations, and along normal travel
- Page 142 and 143: CMS&H STAFFING AND RESOURCE UTILIZA
- Page 144 and 145: CMS&H STAFFING LEVELS District staf
- Page 146 and 147: In addition to the decreased levels
- Page 148 and 149: completion rate decreased dramatica
- Page 150 and 151: Other specialists had limited inspe
- Page 152 and 153: ALLEGATIONS OF INFLUENCE BY THE MIN
- Page 154 and 155: GENERAL CONCLUSION Internal Reviews
- Page 157: APPENDIX A LIST OF PERSONS INTERVIE
- Page 160 and 161: Moore, III, Clarence W. ...........
- Page 163: List of Ground Control Panel Member
- Page 167: Event Number Activity Code Genwal R
- Page 171: Borehole #3 Location: #4 Entry, X-c
- Page 175: APPENDIX F PROGRAM POLICY LETTER NO
- Page 178 and 179: MSHA will develop a pool of qualifi
- Page 180: PROGRAM POLICY LETTER NO. P06-V-11
- Page 185 and 186: EFFECTIVE DATE: 10/24/2006 EXPIRATI
- Page 187 and 188: will accept a dispatcher system, or
- Page 189 and 190: in Mine Emergencies and During the
- Page 191: L. No. 109-236, June 15, 2006, 120
- Page 195 and 196: ISSUE DATE: February 8, 2007 PROGRA
- Page 197 and 198: Within these areas, the supply of b
- Page 199: APPENDIX I CRANDALL CANYON MAIN WES