06.03.2013 Views

a 2003 document whose - Institute for Simulation and Training ...

a 2003 document whose - Institute for Simulation and Training ...

a 2003 document whose - Institute for Simulation and Training ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

12 Minefield detonation<br />

13 Vehicle master power on<br />

14 Vehicle master power off<br />

15 Aggregate state change requested<br />

16 Prevent Collision / Detonation<br />

7.7 <strong>Simulation</strong> Management w/Reliability family<br />

493<br />

Section 7<br />

<strong>Simulation</strong> Management family<br />

The enumerations in this section are specific to the <strong>Simulation</strong> Management w/Reliability protocol.<br />

7.7.1 Required Reliability Service<br />

This field specifies the 8-bit enumeration <strong>for</strong> the Required Reliability Service field in the Create<br />

Entity-R, Remove Entity-R, Start/Resume-R, Stop/Freeze-R, Action Request-R, Data Query-R, Set<br />

Data-R, Data-R, Record Query-R, Set Record-R, <strong>and</strong> Record-R PDUs.<br />

Field Value Required Reliability Service<br />

0 Acknowledged<br />

1 Unacknowledged

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!