E C O N O M I C I N D I C A T O R S ( C O N T I N U E D )<br />

34. ELECTRICAL ENERGY DELIVERIES<br />

ENERGY-DELIVERED<br />

GROWTH RATE<br />

CANADIAN<br />

FISCAL YEAR BY PERCENTAGE <strong>BC</strong> HYDRO UTILITIES<br />

1995/1996 –3.48 3.41<br />

1996/1997 20.27 3.05<br />

1997/1998 1.72 –1.29<br />

1998/1999 14.61 7.50<br />

1999/2000 9.36 5.16<br />

Percentage change in electrical energy deliveries for the combined Canadian and export markets, including all sales to industrial,<br />

commercial, residential and farm, street and area lighting customers, and non-service customers such as other utilities. Internal sales<br />

and energy wheeling are excluded.<br />

35. CUSTOMER AVERAGE INTERRUPTION DURATION INDEX<br />

FISCAL YEAR FOR 1996/1997 1997/1998 1998/1999 1999/2000 2000/<strong>2001</strong><br />

<strong>BC</strong> <strong>Hydro</strong> 121.8 105.6 169.2 112.8 127.2<br />

<strong>BC</strong> <strong>Hydro</strong> Targets na n/a n/a 120 109.8<br />

Canadian Utilities* 72 94.2 82.8 100.2 n/a<br />

*Canadian Utilities’ data is for calendar year end, i.e., 1999 relative to fiscal year 2000 for <strong>BC</strong> <strong>Hydro</strong>. Canadian Utilities’ data for<br />

1999 excludes the ice storm in Quebec and Ontario. Including the ice storm, Customer Average Interruption Duration Index<br />

(CAIDI) would be 508 minutes.<br />

36. PERCENTAGE OF TIME POWER IS AVAILABLE TO <strong>BC</strong> HYDRO CUSTOMERS<br />

FISCAL YEAR FOR 1996/1997 1997/1998 1998/1999 1999/2000 2000/<strong>2001</strong><br />

<strong>BC</strong> <strong>Hydro</strong> 99.9669 99.9772 99.9518 99.974 99.972<br />

<strong>BC</strong> <strong>Hydro</strong> Targets n/a n/a n/a 99.97 99.972<br />

Canadian Utilities* 99.9673 99.9578 99.9621 99.9508 n/a<br />

*Canadian Utilities’ data is for calendar year end, i.e., 1999 relative to fiscal year 2000 for <strong>BC</strong> <strong>Hydro</strong>. Canadian Utilities’ data for<br />

1999 excludes the ice storm in Quebec and Ontario. Including the ice storm, % Average System Availability Index (ASAI) would<br />

be 99.6540.<br />

37. METER READING TIMELINESS AND ACCURACY<br />

METERS READ ON SCHEDULE PER CENT<br />

2000/<strong>2001</strong> Actual 93<br />

2000/<strong>2001</strong> Target 91<br />

<strong>2001</strong>/2002 Target 94<br />

METER READING ACCURACY PER CENT<br />

2000/<strong>2001</strong> Actual 99.92<br />

2000/<strong>2001</strong> Target 99.50<br />

<strong>2001</strong>/2002 Target 99.70<br />