E C O N O M I C I N D I C A T O R S ( C O N T I N U E D )<br />
34. ELECTRICAL ENERGY DELIVERIES<br />
ENERGY-DELIVERED<br />
GROWTH RATE<br />
CANADIAN<br />
FISCAL YEAR BY PERCENTAGE <strong>BC</strong> HYDRO UTILITIES<br />
1995/1996 –3.48 3.41<br />
1996/1997 20.27 3.05<br />
1997/1998 1.72 –1.29<br />
1998/1999 14.61 7.50<br />
1999/2000 9.36 5.16<br />
Percentage change in electrical energy deliveries for the combined Canadian and export markets, including all sales to industrial,<br />
commercial, residential and farm, street and area lighting customers, and non-service customers such as other utilities. Internal sales<br />
and energy wheeling are excluded.<br />
35. CUSTOMER AVERAGE INTERRUPTION DURATION INDEX<br />
FISCAL YEAR FOR 1996/1997 1997/1998 1998/1999 1999/2000 2000/<strong>2001</strong><br />
<strong>BC</strong> <strong>Hydro</strong> 121.8 105.6 169.2 112.8 127.2<br />
<strong>BC</strong> <strong>Hydro</strong> Targets na n/a n/a 120 109.8<br />
Canadian Utilities* 72 94.2 82.8 100.2 n/a<br />
*Canadian Utilities’ data is for calendar year end, i.e., 1999 relative to fiscal year 2000 for <strong>BC</strong> <strong>Hydro</strong>. Canadian Utilities’ data for<br />
1999 excludes the ice storm in Quebec and Ontario. Including the ice storm, Customer Average Interruption Duration Index<br />
(CAIDI) would be 508 minutes.<br />
36. PERCENTAGE OF TIME POWER IS AVAILABLE TO <strong>BC</strong> HYDRO CUSTOMERS<br />
FISCAL YEAR FOR 1996/1997 1997/1998 1998/1999 1999/2000 2000/<strong>2001</strong><br />
<strong>BC</strong> <strong>Hydro</strong> 99.9669 99.9772 99.9518 99.974 99.972<br />
<strong>BC</strong> <strong>Hydro</strong> Targets n/a n/a n/a 99.97 99.972<br />
Canadian Utilities* 99.9673 99.9578 99.9621 99.9508 n/a<br />
*Canadian Utilities’ data is for calendar year end, i.e., 1999 relative to fiscal year 2000 for <strong>BC</strong> <strong>Hydro</strong>. Canadian Utilities’ data for<br />
1999 excludes the ice storm in Quebec and Ontario. Including the ice storm, % Average System Availability Index (ASAI) would<br />
be 99.6540.<br />
37. METER READING TIMELINESS AND ACCURACY<br />
METERS READ ON SCHEDULE PER CENT<br />
2000/<strong>2001</strong> Actual 93<br />
2000/<strong>2001</strong> Target 91<br />
<strong>2001</strong>/2002 Target 94<br />
METER READING ACCURACY PER CENT<br />
2000/<strong>2001</strong> Actual 99.92<br />
2000/<strong>2001</strong> Target 99.50<br />
<strong>2001</strong>/2002 Target 99.70<br />
T R I P L E B O T T O M L I N E A P P E N D I C E S | 9 0