2.4.2 Continuous operation<br />

Camino Generator<br />

Note <strong>and</strong> follow the national working, operating <strong>and</strong> safety regulations for safely<br />

h<strong>and</strong>ling this generator <strong>and</strong> its trouble-free operation.<br />

Check the generator for visible damage at regular intervals!<br />

The generator <strong>and</strong> the control system shall be operated only by instructed operators!<br />

The parameters set by the manufacturer are st<strong>and</strong>ard setting values!<br />

Follow all hints given for the case of malfunction (refer also to the chapter „Failure,<br />

elimination of failure, repair“). If the actions mentioned there do not result in the<br />

elimination of failure, please contact the SET after-sales service department!<br />

Tel.: +49 (0)2173 / 399 37-0 Fax: - / 399 37-21<br />

e-mail: service@set-zeise.de www.set-zeise.de<br />

2.4.3 Special work<br />

• Carry out all maintenance <strong>and</strong> installation work at the generator according to the<br />

hints. Shut down the generator properly.<br />

• Any person in the facility of the owner who is authorised to carry out assembly,<br />

<strong>start</strong>-<strong>up</strong>, operation, maintenance, repair or other work, shall have read <strong>and</strong> understood<br />

the operating manual, <strong>and</strong> in particular the safety notes.<br />

• Keep all setting, maintenance <strong>and</strong> inspection work <strong>and</strong> dates specified in the operating<br />

manual, including the data concerning the replacement of components/sub-assemblies!<br />

This work shall be carried out only by specialised personnel.<br />

• Observe all switching on/off processes according to the operating manual <strong>and</strong><br />

the hints for maintenance for any work related to the operation, production adaptation,<br />

re-equipment or setting of the generator <strong>and</strong> its safety relevant equipment<br />

as well as inspection, maintenance <strong>and</strong> repair!<br />

• Switch off <strong>and</strong> secure the generator against unintended re-connection when carrying<br />

out maintenance work!<br />

• Lock the main comm<strong>and</strong> facilities, withdraw the key <strong>and</strong> keep it!<br />

• Attach a warning plate at the main switch!<br />

03-04-01 Basic safety notes 2-10