Camino Generator<br />
3.4 Protective measures for the electrical installation<br />
The electrical system shall be installed by specialised electricians<br />
only.<br />
3.4.1 Electrical installation of the AC circuit 230V 50Hz<br />
The distribution pox for electrical power – to be mounted by the customer – shall be<br />
at least of IP 54 type of protection.<br />
Install a 2-pole change-over switch with the positions 1 – 0 – 2 as mains/generator<br />
switch.<br />
Install miniature circuit breakers per consumer circuit to protect the consumer circuits.<br />
Lead the electronic connection lines through the appropriate screwed conduit entries.<br />
When replacing a connection line tighten the screwed joints firmly<br />
<strong>and</strong> check for tension.<br />
• Install a protective conductor when installing the electrical system.<br />
• Direct earthing of the generator with the vehicle body is required here.<br />
• In accordance with the regulations of the manufacturer’s country, the protective<br />
measure fault current protective circuit (FI residual current circuit breaker) is required.<br />
Residual current circuit breaker: 0.03A<br />
Another protective measure can be prescribed for installations in other countries.<br />
The installation company for the plant shall be liable in case of accidents if these<br />
regulations are not complied with.<br />
03-04-01 Preparation for installation 3-16