Display Function / explanation<br />

1 0 - 1 - Start Key-operated switch<br />

Camino Generator<br />

2 (h) Sum of accumulated operating hours<br />

Green LED...<br />

Red LED.....<br />

Green LED...<br />

Red LED.....<br />

LED lights <strong>up</strong><br />

...<br />

Green LED...<br />

Red LED.....<br />

Green LED...<br />

Red LED.....<br />

Green LED...<br />

Red LED.....<br />

If battery is charged<br />

If the charging process is interr<strong>up</strong>ted<br />

If the oil pressure is OK<br />

if oil pressure is missing (switches off engine automatically)<br />

As long as the pre-glowing time 15 sec. runs<br />

(<strong>start</strong> is allowed then)<br />

If the inside of the housing is dry<br />

If water is in the soundproofing housing<br />

(switches off engine automatically)<br />

If engine temperature is OK<br />

If engine temperature exceeds 95°C<br />

(switches off engine automatically)<br />

If generator temperature is OK<br />

If generator temperature exceeds 95°C<br />

(switches off engine automatically)<br />

03-04-01 Initial <strong>start</strong>-<strong>up</strong> 7-56