28.05.2013 Views

Installation and start-up - Stange Energietechnik GmbH

Installation and start-up - Stange Energietechnik GmbH

Installation and start-up - Stange Energietechnik GmbH

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.1 Coolant filling<br />

Prior to <strong>start</strong>ing the SET Camino Generator<br />

Fill cooler:<br />

1. Unscrew plug at expansion vessel.<br />

Camino Generator<br />

2. Fill coolant in the expansion vessel until coolant becomes visible.<br />

3. Bleed at the water-cooled exhaust gas elbow (1) at the system bleeding screw<br />

(2).<br />

4. Tighten plug.<br />

5. If necessary, bleed the cooling circuits directly downstream of the pumps.<br />

After <strong>start</strong>ing<br />

1. Start the SET Camino Generator.<br />

2. Top <strong>up</strong> coolant in the expansion vessel.<br />

3. Check the cooler ventilator for proper operation.<br />

If the fist <strong>start</strong> was not successful, turn control panel to „OFF“ <strong>and</strong> wait for approx. 5<br />

s.<br />

Then <strong>start</strong> again.<br />

Look for leaks (re-tighten hose clips).<br />

1. Water-cooled exhaust gas elbow<br />

2. Bleeding screw<br />

03-04-01 Initial <strong>start</strong>-<strong>up</strong> 7-54<br />

2<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!