Installation and start-up - Stange Energietechnik GmbH
Installation and start-up - Stange Energietechnik GmbH
Installation and start-up - Stange Energietechnik GmbH
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Terminal box<br />
Line 1 = + 12 V<br />
Line 2 = 0 V 12<br />
Line 3 = Starter<br />
Line 4 = Pre-glowing<br />
Line 5 = Fuel<br />
Line 6 = Temperature of engine<br />
Line 7 = Temperature of generator<br />
Line 8 = Oil pressure engine<br />
Line 9 = Battery charge<br />
Legend:<br />
External consumers<br />
Dynamo<br />
Geldruch engine<br />
Temperature generator<br />
Temperature engine<br />
External consumers<br />
Fuel solenoid valve<br />
Pre-glowing relay<br />
Start relay<br />
Field <strong>start</strong>er<br />
Pre-glowing<br />
Starter<br />
Accumulator<br />
Connection of the electrical fuel delivery pump<br />
Camino Generators<br />
Appropriate connection lines are led out of the soundproofing hood of the SET<br />
Camino Generator for the connection of the electrical fuel delivery pump.<br />
The electrical fuel delivery pump is operated at 12 V <strong>and</strong> connected<br />
directly at the cables which are lead out of the generator <strong>and</strong> which<br />
are provided with fuses. The fuel delivery pump shall be connected<br />
electrically only by specialised electricians. Risk of short circuit <strong>and</strong><br />
fire in case of improper connection!<br />
03-04-01 Electrical installation 6-47