05.06.2013 Views

MARICO Marine NZ Limited WELLINGTON HARBOUR PORT AND ...

MARICO Marine NZ Limited WELLINGTON HARBOUR PORT AND ...

MARICO Marine NZ Limited WELLINGTON HARBOUR PORT AND ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Report No: 05<strong>NZ</strong>104 <strong>WELLINGTON</strong> <strong>HARBOUR</strong><br />

Issue: Issue 1.1 Operational Risk Assessment<br />

Rank<br />

Hazard<br />

Reference<br />

Accident<br />

Category<br />

28 49<br />

18 47<br />

5 54<br />

Contact Berthing<br />

Contact Berthing<br />

Mooring<br />

Breakout<br />

Hazard<br />

Title<br />

&<br />

Area<br />

Affected<br />

Small<br />

Harbour<br />

Ferry<br />

Contact<br />

C, D<br />

Vessel in<br />

Contact<br />

Berthing<br />

C,D<br />

Mooring<br />

Breakout –<br />

Container<br />

C<br />

Existing Risk Control<br />

Harbour Regulator<br />

1.0 Harbour organisation<br />

2.1 Weather and traffic information service<br />

2.3 Incident communications facility<br />

1.0 Harbour organization<br />

2.1 Weather and traffic information service<br />

2.3 Incident communications facility<br />

6.2 Exemption process<br />

1.0 Harbour organization<br />

2.1 Weather and traffic information service<br />

2.3 Incident communications facility<br />

Existing Risk Control<br />

CentrePort<br />

2.1 Key port limiting parameters<br />

2.2 Pilot/master exchange<br />

2.4 Pilot allocation/movement<br />

planning<br />

2.7 Berthing planning<br />

3.1 <strong>Marine</strong> personnel experience<br />

and expertise<br />

3.2 <strong>Marine</strong> personnel training<br />

systems<br />

3.3 <strong>Marine</strong> personnel<br />

management practice<br />

4.1 Tugs<br />

2.2 Pilot/master exchange<br />

2.8 Mooring guidelines<br />

3.1 <strong>Marine</strong> personnel experience<br />

and expertise<br />

4.1 Tugs<br />

4.4 Storm lines<br />

4.5 Bollard provision<br />

Greater Wellington Regional Council /<br />

CentrePort Ltd Page F12 of F20<br />

Notes<br />

Vessels should not normally be approaching a<br />

wharf at a speed greater than 5 knots due to<br />

Bylaw restrictions on speed within 200 metres<br />

of the shore or structure.<br />

Wharf structures used by RoRo ferries are of<br />

wooden construction, dating back a<br />

considerable time and susceptible to heavy<br />

landing damage.<br />

Wharf structures in many areas are of wooden<br />

construction, dating back a considerable time<br />

and susceptible to heavy landing damage.<br />

There are no berth limiting parameters in terms<br />

of displacement or length.<br />

The pilot/.master exchange includes passing of<br />

information to the master regarding contact<br />

details of Beacon Hill and other agencies in the<br />

event of emergency.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!