Report No: 05<strong>NZ</strong>104 <strong>WELLINGTON</strong> <strong>HARBOUR</strong><br />

Issue: Issue 1.1 Operational Risk Assessment<br />

The available bollard pull to vessel GT ratio has been falling over the years<br />

as larger vessels trade to the port. Unless CentrePort accepts windage load<br />

limitations on the large vessels it is handling, it simply cannot and should<br />

not put off replacement tug procurement much longer. At 35 years of age,<br />

procurement of original spares is becoming difficult.<br />

A recommended solution is made against the risk profile in section 13.3.<br />