29.06.2013 Views

Ben-Gurion University of the Negev Jacob Blaustein Institutes for ...

Ben-Gurion University of the Negev Jacob Blaustein Institutes for ...

Ben-Gurion University of the Negev Jacob Blaustein Institutes for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

32<br />

So that, <strong>for</strong> a network composed by 4 sources and 5 destinations <strong>the</strong>re are 20 possible<br />

arcs <strong>of</strong> transportation (see figure 12). ArcGis was used to measure <strong>the</strong> relevant<br />

characteristic <strong>of</strong> <strong>the</strong> network: a) location <strong>of</strong> <strong>the</strong> nodes; b) length <strong>of</strong> <strong>the</strong> arcs; c) elevation<br />

<strong>of</strong> every supply and demand node.<br />

Figure 10 – Network representation and arc length<br />

3.9 From <strong>the</strong> Transportation Model to <strong>the</strong> Transshipment<br />

Network<br />

The transshipments network was built on <strong>the</strong> basis <strong>of</strong> <strong>the</strong> solution obtained from <strong>the</strong><br />

transportation model. Figure 11 shows <strong>the</strong> transshipment network overlapped on <strong>the</strong><br />

solution <strong>of</strong> <strong>the</strong> transportation problem. Light blue arrows show <strong>the</strong> directions and <strong>the</strong><br />

amounts <strong>of</strong> water transported from sources to destinations.<br />

The layout <strong>of</strong> <strong>the</strong> transshipment network was made on <strong>the</strong> basis <strong>of</strong> <strong>the</strong> following<br />

considerations:<br />

a) The number <strong>of</strong> supply nodes were reduced from 4 to 2. Supply n.91 and n.86<br />

were grouped in a single node and nodes n.86 and n.78 were excluded because<br />

<strong>the</strong>y provide a negligible supply;<br />

b) The number <strong>of</strong> demand nodes was reduced from 5 to 4. Demand nodes n.84 and<br />

n.85 were grouped in a single node;