HYDROMATRIX ® as best solution<br />

With the planned realization of a<br />

small-scale <strong>hydro</strong>power plant near<br />

the Schemerl Weir at the <strong>in</strong>take of<br />

the Vienna Danube Canal, Verbund-<br />

Austria Hydro Power and its project<br />

partners EVN and Wienstrom,<br />

have sent an important signal concern<strong>in</strong>g<br />

the best possible use of<br />

<strong>hydro</strong>power.<br />

Location of plant<br />

The idea of us<strong>in</strong>g the Danube Canal for<br />

the generation of power is closely<br />

related to the construction of Freudenau<br />

power station on the Danube.<br />

Concepts for the use of the banked-up<br />

waters of the new power station by<br />

means of a small-scale <strong>hydro</strong>power<br />

plant near the exist<strong>in</strong>g weirs at the <strong>in</strong>take<br />

of the Danube Canal (Schemerl<br />

Weir) were considered already at the<br />

end of the 1990s. However, at that<br />

time this project was not pursued<br />

for economic reasons.<br />

The realization of the “Nussdorf<br />

small-scale <strong>hydro</strong>power plant” project<br />

first became economically viable<br />

follow<strong>in</strong>g the pass<strong>in</strong>g of new “green<br />

power” legislation and the a<strong>va</strong>ilability<br />

of the new HYDROMATRIX ® <strong>tech</strong>nology.<br />

A major feature of the project is its<br />

careful <strong>in</strong>tegration <strong>in</strong>to the exist<strong>in</strong>g<br />

Nussdorf Weir build<strong>in</strong>g complex designed<br />

by the famous Jugendstil<br />

architect Otto Wagner.<br />

The contract will be executed by<br />

VA TECH HYDRO together with Porr<br />

Technobau and Verbundplan as<br />

consortium leader.<br />

The small-scale <strong>hydro</strong>power plant<br />

consists of a 30 m long, approx. 12 m<br />

wide and 7 m high over-flow hollow<br />

body weir with attached pneumatically<br />

operated spillway gates, twelve<br />

HYDROMATRIX ® turb<strong>in</strong>e generator<br />

units and an operation build<strong>in</strong>g.<br />

With the HYDROMATRIX ® concept it is<br />

now possible to comply with the exist<strong>in</strong>g<br />

weir operat<strong>in</strong>g procedure and<br />

secure the required flow for navigation<br />

at all times of the year.<br />

KEY PROJECTS<br />

The HYDROMATRIX ® plant is scheduled<br />

to commence supply of electricity already<br />

<strong>in</strong> summer 2005. From today’s perspective,<br />

the electricity produced will meet<br />

the needs of about 7,500 households.<br />

Harald Schmid<br />

Phone +43/732 6987 3343<br />

harald.schmid@<strong>va</strong><strong>tech</strong>-<strong>hydro</strong>.at<br />

Technical data:<br />

Output: 545.7 kW<br />

Voltage: 690 V<br />

Head: 5.86 m<br />

Speed: 336.7 rpm<br />

Runner diameter: 1,320 mm<br />

Annual production: 24.7 GWh<br />