14.08.2013 Views

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4<br />

TOP STORY<br />

TSANKOV KAMAK<br />

VA TECH HYDRO Leads Efforts to Use Hydropower <strong>in</strong> Climate Protection<br />

In its efforts to meet its obligations<br />

under the Kyoto Protocol,<br />

the Republic of Austria is<br />

receiv<strong>in</strong>g <strong>va</strong>luable assistance<br />

from VA TECH HYDRO.<br />

Austria has committed itself to<br />

reduc<strong>in</strong>g its emissions of carbon<br />

dioxide, methane and four other<br />

greenhouse gasses by 13% below<br />

their 1990 levels by the year 2012. Up<br />

to 50% of the needed reductions can<br />

be achieved through climate protection<br />

projects <strong>in</strong> other <strong>in</strong>dustrial countries<br />

(Jo<strong>in</strong>t Implementation, JI) and <strong>in</strong><br />

develop<strong>in</strong>g countries (Clean Development<br />

Mechanism, CDM). There are<br />

tradable emission certificates for<br />

projects result<strong>in</strong>g <strong>in</strong> reduced emissions<br />

abroad that are credited to the<br />

domestic target. An Austrian bank<br />

handles the purchase of emission<br />

certificates from Kyoto projects on<br />

behalf of the Republic of Austria.<br />

Hydropower plant Tsankov<br />

Kamak as the first climate<br />

protection project<br />

On October 1, VA TECH HYDRO,<br />

together with its consortium partners<br />

Verbundplan and Alp<strong>in</strong>e<br />

Mayreder, signed the contracts with<br />

the Bulgarian company Natsionalna<br />

Elektricheska Kompania (NEK) to<br />

equip the Bulgarian <strong>hydro</strong>power<br />

plant "Tsankov Kamak” on the<br />

Vacha River <strong>in</strong> the Rhodope Mounta<strong>in</strong>s,<br />

about 250 kilometers southeast<br />

of Sofia. The contract is for the<br />

complete <strong>hydro</strong>– and electro-<br />

mechanical equipment for the<br />

Tsankov Kamak <strong>hydro</strong>power plant.<br />

The sign<strong>in</strong>g ceremony took place <strong>in</strong><br />

the "Council of M<strong>in</strong>isters" <strong>in</strong> Sofia /<br />

Bulgaria <strong>in</strong> the presence of his excellency,<br />

the Bulgarian Prime M<strong>in</strong>ister<br />

Simeon Borisow Sakskoburgotski<br />

and the M<strong>in</strong>ister for Energy,<br />

Mr. Ko<strong>va</strong>cev.<br />

The VA TECH HYDRO scope of<br />

supplies comprises the design,<br />

eng<strong>in</strong>eer<strong>in</strong>g, construction, transport,<br />

<strong>in</strong>stallation and commission<strong>in</strong>g of<br />

two vertical Francis–type turb<strong>in</strong>es<br />

(see <strong>tech</strong>nical data below) with<br />

digital governors and two butterfly<br />

<strong>in</strong>let <strong>va</strong>lves with a diameter of<br />

2.25 m, two vertical, rigid coupled<br />

generators, transformers, MV and<br />

HV switchyard equipment with SF6<br />

breakers, station service system,<br />

plant control system, one ecological<br />

unit (1.3 MW) as well as the complete<br />

<strong>hydro</strong>-mechanical equip-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!