ment for the <strong>in</strong>take structure (one<br />
set of trashracks 6.0 x 9.24 m, one<br />
set of <strong>in</strong>take stoplogs as well as one<br />
set of <strong>in</strong>take gates 5.5 x 6.5 m), the<br />
dam (4 radial gates 8.0 x 6.15 m and<br />
one set of spillway stoplogs 8.07 x<br />
6.2 m as well as the bottom outlet<br />
equipment), and the outlet itself<br />
(2 sets of draft tube stoplogs 3.8 x 3,0<br />
m) as well as a 640 m long, one l<strong>in</strong>ed<br />
penstock with a maximum diameter<br />
of 4,400 mm and a bifurcation.<br />
At the same time, also the civil contract<br />
was negotiated with Verbundplan<br />
and ALPINE – MAYREDER,<br />
both Austrian companies act<strong>in</strong>g<br />
under the overall coord<strong>in</strong>ation of<br />
VA TECH HYDRO. This coord<strong>in</strong>ation,<br />
amongst other duties, also <strong>in</strong>cludes<br />
the arrangement of a 100% project<br />
f<strong>in</strong>anc<strong>in</strong>g, arranged by VA TECH<br />
FINANCE with a bank consortium<br />
under the leadership of Bank Austria<br />
Creditanstalt AG. The respective<br />
loan agreements were signed on<br />
November 14, 2003 <strong>in</strong> Vienna.<br />
VA TECH FINANCE has been<br />
accompany<strong>in</strong>g the project for more<br />
than two years, be<strong>in</strong>g responsible<br />
for arrang<strong>in</strong>g the entire f<strong>in</strong>ancial<br />
set-up of the project – a project that<br />
is based on a bilateral Memorandum<br />
of Understand<strong>in</strong>g between the<br />
M<strong>in</strong>istries of Environment <strong>in</strong> Vienna<br />
and Sofia. In letters exchanged<br />
thereafter between the m<strong>in</strong>isters,<br />
HEPP Tsankov Kamak was declared<br />
a pilot project, to be realized on a<br />
bilateral basis as a Jo<strong>in</strong>t Implementation-Project<br />
with<strong>in</strong> the framework<br />
of the Kyoto Protocol.<br />
The construction period of the<br />
project is scheduled to be f<strong>in</strong>ished<br />
by the end of 2007, perfectly timed<br />
to the first Kyoto commitment<br />
period start<strong>in</strong>g on January 1, 2008<br />
for the generation of the emission<br />
certificates. These certificates, sold<br />
and transferred to the Austrian<br />
government, are part of the project<br />
f<strong>in</strong>anc<strong>in</strong>g scheme of the Bulgarian<br />
client. The outstand<strong>in</strong>g feature of<br />
this project, however, lies <strong>in</strong> its development<br />
as a climate protection<br />
project and as a consequence <strong>in</strong> the<br />
additional f<strong>in</strong>anc<strong>in</strong>g by means of<br />
emission certificates. Issu<strong>in</strong>g emission<br />
certificates upon tak<strong>in</strong>g <strong>in</strong>to<br />
operation Tsankov Kamak <strong>hydro</strong>power<br />
plant dur<strong>in</strong>g the Kyoto commitment<br />
period from January 1,<br />
2008 until the end of 2012 is equi<strong>va</strong>lent<br />
to approximately 1.1 million<br />
tons of CO2, be<strong>in</strong>g roughly one<br />
sixth of the Austrian <strong>in</strong>dustries’<br />
Kyoto target.<br />
With the realization of the Tsankov<br />
Kamak <strong>hydro</strong>power project<br />
VA TECH HYDRO is not only a<br />
pioneer <strong>in</strong> assist<strong>in</strong>g the Austrian<br />
government <strong>in</strong> fulfill<strong>in</strong>g its Kyoto<br />
targets but also <strong>in</strong> prolong<strong>in</strong>g and<br />
<strong>in</strong>tensify<strong>in</strong>g the longstand<strong>in</strong>g cooperation<br />
with NEK.<br />
New Approach to Susta<strong>in</strong>able<br />
Projects <strong>in</strong> the Future<br />
The climate protection mechanisms<br />
known as Jo<strong>in</strong>t Implementation and<br />
Clean Development open up a<br />
whole new approach to project<br />
development. New power plant<br />
projects now on the borderl<strong>in</strong>e of<br />
not be<strong>in</strong>g feasible will be easier to<br />
carry out if certificates can help to<br />
f<strong>in</strong>ance them. For VA TECH HYDRO,<br />
Tsankov Kamak is just the beg<strong>in</strong>n<strong>in</strong>g<br />
of these efforts and further projects<br />
are already <strong>in</strong> the plann<strong>in</strong>g stage.<br />
He<strong>in</strong>z Pichler<br />
Phone +43/732 6987 2835<br />
he<strong>in</strong>z.pichler@<strong>va</strong><strong>tech</strong>-<strong>hydro</strong>.at<br />
Technical data:<br />
Output: 2 x 43 MW / 2 x 50 MVA<br />
Voltage: 11 kV<br />
Head: 138.7 m<br />
Speed: 428.6 rpm<br />
Runner diameter: 1,800 mm<br />
Stator frame diameter: 5,100 mm<br />