14.08.2013 Views

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ENERGY GLOBE AWARD FOR<br />

RIO AMOYA PROJECT IN COLOMBIA<br />

In an Oscar-style award nom<strong>in</strong>ation<br />

for susta<strong>in</strong>able energy projects<br />

(Energy Globe Award) held<br />

on 12 November 2003 at the<br />

Design Center L<strong>in</strong>z, Austria, the<br />

Rio Amoya <strong>hydro</strong>power project <strong>in</strong><br />

Colombia carried away the first<br />

prize <strong>in</strong> the water category.<br />

The Amoya River project is located<br />

<strong>in</strong> Colombia and is supported by the<br />

World Bank and the UN. The <strong>hydro</strong>electric<br />

run-off river power plant will<br />

have an <strong>in</strong>stalled capacity of 80 MW<br />

and an annual energy production of<br />

568 GWh. The plant will considerably<br />

help to reduce CO2 emissions.<br />

The flora and fauna of the<br />

Las Hermosas national park and<br />

the Paramo plateau will be protected<br />

through the use of clean<br />

<strong>hydro</strong>power. The project is implemented<br />

<strong>in</strong> cooperation with the<br />

local community and <strong>in</strong>cludes the<br />

promotion of eco-tourism and<br />

micro-enterprises, programmes to<br />

protect the biodiversity of the bas<strong>in</strong><br />

and health, education, agriculture<br />

and fisheries programmes. The <strong>in</strong>tegrative<br />

approach, which dist<strong>in</strong>guishes<br />

this project very positively<br />

from projects oriented exclusively<br />

on the exploitation of waterpower<br />

potential, is exemplary to all future<br />

<strong>hydro</strong>power projects <strong>in</strong> similar<br />

6<br />

CUSTOMER FORUM<br />

areas. For this project VA TECH<br />

HYDRO is to supply the entire<br />

electromechanical package. The<br />

customer is HIDROGER.<br />

Gabriel Jaime Ortega is co-founder<br />

and <strong>tech</strong>nical director of Medell<strong>in</strong>based<br />

GENERADORA UNION. The<br />

Rio Amoya <strong>hydro</strong>power project <strong>in</strong><br />

the Colombian Andes was developed<br />

under his leadership. VA TECH<br />

HYDRO asked the w<strong>in</strong>ner of<br />

the Energy Globe Award for an<br />

<strong>in</strong>terview:<br />

What does this award mean to<br />

you?<br />

This award is the recognition of six<br />

years of hard work. We have<br />

realised that the susta<strong>in</strong>ability of<br />

projects is of the utmost importance<br />

for our future. It does not suffice if a<br />

project simply serves the general<br />

progress of a country. For this very<br />

reason it is not only an encouragement<br />

but has speeded up a process,<br />

which is to benefit the overall project<br />

with respect to the rema<strong>in</strong><strong>in</strong>g<br />

tasks of f<strong>in</strong>alis<strong>in</strong>g f<strong>in</strong>anc<strong>in</strong>g up to<br />

the start of construction and afterwards<br />

dur<strong>in</strong>g the construction<br />

phase itself. However, this award<br />

also goes to the local population, <strong>in</strong><br />

particular the farmers, who never<br />

Gabriel Jaime Ortega,<br />

w<strong>in</strong>ner of the Energy Globe Award<br />

ceased to believe <strong>in</strong> the feasibility of<br />

their project and supported it<br />

accord<strong>in</strong>gly dur<strong>in</strong>g this lengthy and<br />

costly process.<br />

How did this project come about?<br />

In 1995, ISAGEN, one of Colombia’s<br />

major state-owned power utilities,<br />

and Generadora Union chose Rio<br />

Amoya from a number of projects.<br />

Over the follow<strong>in</strong>g years construction,<br />

cost and feasibility studies<br />

were completed. As a result of its<br />

pri<strong>va</strong>tisation ISAGEN withdrew from<br />

the project <strong>in</strong> 2000. Generadora<br />

Union decided to go forward on its

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!