XIA LONG MEN, ZILANBA, JINXI<br />

Jo<strong>in</strong>tly with its local partner<br />

DONGFANG, VA TECH HYDRO<br />

has won contracts to supply<br />

Kaplan bulb turb<strong>in</strong>e components<br />

to Sichuan and cont<strong>in</strong>ues its<br />

success <strong>in</strong> the Ch<strong>in</strong>ese market.<br />

12<br />

KEY PROJECTS<br />

The scope of supply comprises the<br />

hydraulic design and ma<strong>in</strong> components<br />

of three Kaplan bulb turb<strong>in</strong>es<br />

for the ZILANBA project as well as<br />

the ma<strong>in</strong> components of four Kaplan<br />

bulb turb<strong>in</strong>es for the JINXI project.<br />

Already <strong>in</strong> December 2003,<br />

VA TECH HYDRO was awarded the<br />

contract to manufacture and deliver<br />

the runner blades for XIA LONG<br />

MEN power plant, which comprises<br />

four Kaplan pit turb<strong>in</strong>es. All projects<br />

are located <strong>in</strong> the prov<strong>in</strong>ce of<br />

Sichuan, Ch<strong>in</strong>a. The new contract<br />

came <strong>in</strong>to force early <strong>in</strong> January<br />

2004.<br />

The projects will be carried out together<br />

with DONGFANG, a well-established<br />

Ch<strong>in</strong>ese turb<strong>in</strong>e and generator<br />

manufacturer. Subsequently,<br />

a contract was signed with DONG-<br />

FANG which is to form the basis of<br />

cooperation <strong>in</strong> future projects.<br />

S<strong>in</strong>ce 1978, VA TECH HYDRO has<br />

supplied turb<strong>in</strong>es, generators and<br />

power plant equipment for more<br />

than 20 <strong>hydro</strong>power plants <strong>in</strong> Ch<strong>in</strong>a.<br />

These new projects will enable<br />

VA TECH HYDRO to aga<strong>in</strong> strengthen<br />

its position as a competent and<br />

experienced partner for susta<strong>in</strong>able<br />

solutions <strong>in</strong> the boom<strong>in</strong>g <strong>hydro</strong> market<br />

of Ch<strong>in</strong>a.<br />

The equipment is scheduled to be<br />

delivered <strong>in</strong> 2005 and 2006. The<br />

power plants shall commence commercial<br />

operation <strong>in</strong> 2006 and 2007.<br />

Josef Gr<strong>in</strong><strong>in</strong>ger<br />

Phone +43/732 6987 4843<br />

josef.gr<strong>in</strong><strong>in</strong>ger@<strong>va</strong><strong>tech</strong>-<strong>hydro</strong>.at<br />

Technical data (Xia Long Men):<br />

Output: 15.2 MW<br />

Head: 5.0 m<br />

Speed: 75.0 rpm<br />

Runner diameter: 6,500 mm<br />

Technical data (Zilanba):<br />

Output: 35.8 MW<br />

Head: 15.4 m<br />

Speed: 136.4 rpm<br />

Runner diameter: 5,350 mm<br />

Technical data (J<strong>in</strong>xi):<br />

Output: 41.9 MW<br />

Head: 14.5 m<br />

Speed: 115.4 rpm<br />

Runner diameter: 5,900 mm