MANDRAKA<br />
In November 2003, VA TECH<br />
HYDRO <strong>in</strong> France was entrusted<br />
with the rehabilitation of the<br />
<strong>hydro</strong>electric power plant <strong>in</strong>-<br />
Mandraka, Madagascar. Restart<br />
is planned for November 2004.<br />
14<br />
KEY PROJECTS<br />
The client is the public company<br />
JIRO SY RANO MALAGASY (JIRAMA).<br />
The project has been developed<br />
with European f<strong>in</strong>anc<strong>in</strong>g (BEI).<br />
The project is situated 70 km from<br />
Antananarivo, on the road l<strong>in</strong>k<strong>in</strong>g<br />
the capital with the harbour of<br />
Toamas<strong>in</strong>a. The head of Mandraka,<br />
the river by the same name,<br />
uses a first drop of 250 m with 70<br />
million m3 deriv<strong>in</strong>g from Mantasoa,<br />
to which a contribution of 55 million<br />
m3 of the Mandraka is added.<br />
Mantasoa is located at the border of<br />
the first step of the Eastern cliff <strong>in</strong><br />
the proximity of the watershed.<br />
The power station is currently<br />
equipped with four Vevey Pelton<br />
units <strong>in</strong>stalled <strong>in</strong> 1958 (unit power<br />
6 MW) for a head of 250 m. Each<br />
group is equipped with two runners<br />
on the same turb<strong>in</strong>e shaft, with two<br />
<strong>in</strong>jectors per runner. The rehabilitation<br />
pr<strong>in</strong>cipally <strong>in</strong>cludes the supply<br />
of four new Pelton runners, two new<br />
turb<strong>in</strong>e shafts, four new oil tanks<br />
with accumulators, two new speed<br />
governors, the rehabilitation of mechanical<br />
components as well as an<br />
electrical assembly compris<strong>in</strong>g<br />
transformers, switchgear and electrical<br />
equipment with our partner<br />
CEGELEC.<br />
This project is very important for the<br />
island of Madagascar because it<br />
represents on its own 12% of the <strong>in</strong>stalled<br />
electrical power alone. This<br />
rehabilitation concern<strong>in</strong>g the four<br />
groups (with different supplies for<br />
each group) should therefore be<br />
done step by step <strong>in</strong> order to ma<strong>in</strong>ta<strong>in</strong><br />
maximum power generation<br />
dur<strong>in</strong>g the construction period.<br />
VA TECH HYDRO <strong>in</strong> France will lead<br />
this project to the end us<strong>in</strong>g all<br />
the competences of the VA TECH<br />
HYDRO group to ensure the<br />
quality required under the terms of<br />
contract.<br />
Robert Cartier<br />
Phone +33/4 76 85 95 27<br />
robert.cartier@bouvier<strong>hydro</strong>.fr<br />
Technical data:<br />
Output: 6.1 MW<br />
Head: 234 m<br />
Speed: 600 rpm<br />
Runner diameter: 1,000 mm