14.08.2013 Views

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

va tech hydro in india - ANDRITZ Vertical volute pumps

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

own. Special terms and conditions<br />

were created to attract <strong>in</strong>ternational<br />

<strong>in</strong>vestors. In f<strong>in</strong>anc<strong>in</strong>g this project,<br />

issu<strong>in</strong>g emission certificates was<br />

considered for the first time. This<br />

allowed to <strong>in</strong>clude the local farmers<br />

as they were given the chance to<br />

participate f<strong>in</strong>ancially. The Rio<br />

Amoya region is characterised by<br />

widespread poverty and a host of<br />

social problems offer<strong>in</strong>g only limited<br />

opportunities to the local population.<br />

Thus, a power generation project<br />

has turned <strong>in</strong>to a susta<strong>in</strong>able<br />

energy and development project.<br />

What social effects do you expect<br />

the Rio Amoya project to br<strong>in</strong>g<br />

about?<br />

In addition to feed<strong>in</strong>g electricity<br />

<strong>in</strong>to the national power grid, part of<br />

the annual <strong>in</strong>come from emission<br />

certificates will be <strong>in</strong>vested <strong>in</strong><br />

development and environmental<br />

protection programmes for a better<br />

future of the some 6,300 <strong>in</strong>habitants<br />

of this region. Already <strong>in</strong> the construction<br />

phase US$ 2.7 million will<br />

be spent on social <strong>in</strong>vestments over<br />

a period of 28 months. This money<br />

is designed to improve the health<br />

and education systems <strong>in</strong> the<br />

Canon de Las Hermosas region.<br />

Dur<strong>in</strong>g the operative phase 20% or<br />

approx. US$ 400,000 from the sale<br />

of emission certificates will be<br />

<strong>in</strong>vested <strong>in</strong> ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g the newly<br />

created structures. Moreover, new<br />

programmes for preser<strong>va</strong>tion and<br />

protection of the eco system<br />

surround<strong>in</strong>g the project site will be<br />

launched.<br />

The source of energy is the<br />

plateau (Paramo) of the Las Hermosas<br />

national park. What is so<br />

special about this area?<br />

The Rio Amoya run-off river power<br />

plant will be driven by the waters<br />

of the river by the same name,<br />

which orig<strong>in</strong>ates on the Paramo de<br />

Las Hermosas. The people liv<strong>in</strong>g on<br />

this plateau have already <strong>in</strong>itiated<br />

several environmental protection<br />

programmes. This region is home to<br />

numerous species such as the Oso<br />

de Anteojos or parrots for which a<br />

protection programme will be<br />

necessary. The Paramo de Las<br />

Hermosas plateau covers an area of<br />

60,000 hectares and is situated at<br />

an altitude of 3,300 to 4,500 metres<br />

above sea level. At approx. 2,800 m<br />

to 3,300 m there is the most important<br />

eco system of the region, the<br />

tropical mounta<strong>in</strong> forest or Bosque<br />

Alfond<strong>in</strong>o. The project itself is located<br />

at an altitude of 1,500 m. The<br />

major part of environmental protection<br />

resources will be devoted to<br />

these two systems, the mounta<strong>in</strong><br />

forest and the Paramo plateau.<br />

Once <strong>in</strong> operation, the plant will<br />

generate additional revenue from<br />

the sale of emission certificates.<br />

How important are these revenues<br />

for the project?<br />

This <strong>in</strong>come is absolutely necessary<br />

both for the f<strong>in</strong>ancial part and the<br />

social aspect of the project as it<br />

makes possible the social projects<br />

for the region and helps to ensure<br />

f<strong>in</strong>anc<strong>in</strong>g. In Colombia there are<br />

many <strong>in</strong>vestment barriers, which<br />

prevent the realisation of projects.<br />

For <strong>in</strong>stance, the high <strong>in</strong>terest rates<br />

for project f<strong>in</strong>anc<strong>in</strong>g due to the<br />

substantial risks associated with<br />

Colombia. The US$ 22 million generated<br />

over a period of twelve years<br />

from the certificates offer additional<br />

security for <strong>in</strong>vestors. Otherwise,<br />

the return on <strong>in</strong>vestment would not<br />

be sufficient for foreign <strong>in</strong>vestors for<br />

the reasons stated above. The<br />

additional revenue is expected to<br />

<strong>in</strong>crease ROI by approx. 1% to<br />

1.5%, which could be a decisive<br />

factor <strong>in</strong> f<strong>in</strong>d<strong>in</strong>g any <strong>in</strong>vestors at all.<br />

Your plans for the future?<br />

I would like to cont<strong>in</strong>ue work<strong>in</strong>g on<br />

susta<strong>in</strong>able projects, tak<strong>in</strong>g down<br />

<strong>in</strong>vestment barriers. New projects<br />

are already be<strong>in</strong>g <strong>in</strong>vestigated.<br />

These <strong>in</strong>clude AGUAFRESCA with<br />

an <strong>in</strong>stalled capacity of 7.4 MW,<br />

the 20 MW MONTANITAS project as<br />

well as the two major projects<br />

of ENCIMADAS (90 MW) and<br />

CAÑAVERAL (80 MW). All the necessary<br />

construction and operation<br />

permits have already been obta<strong>in</strong>ed<br />

for these projects.<br />

What are your expectations with<br />

respect to the cooperation with<br />

VA TECH HYDRO?<br />

This is a competitive project. For<br />

this reason, we want the best eng<strong>in</strong>eers<br />

and consultants we can get.<br />

VA TECH HYDRO supported us with<br />

their <strong>tech</strong>nological and commercial<br />

expertise not only at the tender<strong>in</strong>g<br />

stage but also <strong>in</strong> the structur<strong>in</strong>g of<br />

the overall project. In particular this<br />

latter phase required a good deal of<br />

patience from all those <strong>in</strong>volved. We<br />

are genu<strong>in</strong>ely <strong>in</strong>terested <strong>in</strong> cooperat<strong>in</strong>g<br />

with VA TECH HYDRO <strong>in</strong> the<br />

realisation of future projects.<br />

Beat Ritschard (right)<br />

Phone +57/1 655 82 00<br />

britschard@<strong>va</strong><strong>tech</strong>.com.co<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!