16<br />
CANADA<br />
HIGHLIGHTS<br />
TOULNUSTOUC<br />
Realized with<strong>in</strong> the framework of<br />
the order to VA TECH HYDRO <strong>in</strong><br />
Vevey for the turb<strong>in</strong>e governors for<br />
the two Francis turb<strong>in</strong>es, "the<br />
Hydro Quebec homologation” of<br />
the new governor head Neptun-TC<br />
1703 will allow VA TECH HYDRO to<br />
be qualified as a preferential supplier<br />
of HYDRO QUEBEC for govern<strong>in</strong>g<br />
systems for hydraulic turb<strong>in</strong>es.<br />
This homologation process, very<br />
similar to the one followed by EDF,<br />
consists of two aspects, which aim<br />
at check<strong>in</strong>g the robustness of the<br />
product on the one hand (norm<br />
SN1008), and its performanc on the<br />
other hand (norm SN38.1). At the end<br />
of September, the functional tests<br />
were successfully performed with<br />
the participation of the Hydro<br />
Quebec specialists on the Vevey test<br />
platform. Validation on site will be<br />
done dur<strong>in</strong>g the commission<strong>in</strong>g <strong>in</strong><br />
2004. The robustness tests of the<br />
electronic components will be executed<br />
soon at the VA TECH SAT test<br />
laboratory <strong>in</strong> Vienna.<br />
Technical data:<br />
Output: 247 MW<br />
Head: 164 m<br />
Speed: 200 rpm<br />
Jean-Jacques Hemmeler<br />
Phone +41/21 925 7810<br />
jj.hemmeler@<strong>va</strong><strong>tech</strong>-<strong>hydro</strong>.ch<br />
USA<br />
BRADLEY LAKE<br />
The ACP Department of VA TECH<br />
HYDRO USA is currently work<strong>in</strong>g<br />
on the recently awarded contract<br />
for Electronic Governor Retrofit for<br />
the two governors of the Bradley<br />
Lake project.<br />
The contract was awarded <strong>in</strong> October<br />
2003 by Homer Electric Association.<br />
The project <strong>in</strong>cludes assessment of<br />
the exist<strong>in</strong>g power oscillations, eng<strong>in</strong>eer<strong>in</strong>g,<br />
supply of new deflector and<br />
needle control <strong>va</strong>lves and electronic<br />
control modules, <strong>in</strong>stallation, supervision,<br />
and performance tests for both<br />
units <strong>in</strong> the plant. Additional work was<br />
authorized <strong>in</strong> January 2004, <strong>in</strong>clud<strong>in</strong>g<br />
model test<strong>in</strong>g and eng<strong>in</strong>eer<strong>in</strong>g to<br />
solve deflector problems. The plant<br />
location is very remote, and is accessible<br />
only by air or water. Inclement<br />
weather can have a significant impact<br />
on the time required to get to the plant<br />
and perform the required work.<br />
VA TECH HYDRO was awarded the<br />
contract based on our ad<strong>va</strong>nced <strong>tech</strong>nologies<br />
and the overall <strong>va</strong>lue of the<br />
solution to the owner. The eng<strong>in</strong>eer<strong>in</strong>g<br />
for the project is currently under way,<br />
and the equipment will be delivered<br />
and <strong>in</strong>stalled <strong>in</strong> May 2005. This is an<br />
important reference for VA TECH<br />
HYDRO, and should lead to several<br />
similar projects for clients with governor<br />
stability problems, especially <strong>in</strong><br />
the western region of the US.<br />
Technical data:<br />
Output: 63.1 MW<br />
Net head: 335.3 m<br />
Speed: 300 rpm<br />
Runner diameter: 2,350 mm<br />
Osw<strong>in</strong> Moeller<br />
Phone +1/704 943 4343<br />
omoeller@<strong>va</strong><strong>tech</strong><strong>hydro</strong>.com<br />
USA<br />
FLAMING GORGE<br />
The US Bureau of Reclamation has<br />
awarded VA TECH HYDRO USA a<br />
contract for the supply of three<br />
new Francis runners for Flam<strong>in</strong>g<br />
Gorge <strong>hydro</strong>power plant, located<br />
<strong>in</strong> Utah <strong>in</strong> the US.<br />
The scope of supply <strong>in</strong>cludes a<br />
model test, new runners, new wicket<br />
gates, and the refurbishment of<br />
all other mechanical parts VA TECH<br />
HYDRO USA will have a crew and<br />
supervisors on site for the duration<br />
of the contract. One of the primary<br />
reasons for VA TECH to w<strong>in</strong> the<br />
contract was the high efficiency of<br />
the units, and the result<strong>in</strong>g high<br />
return on <strong>in</strong>vestment for the Bureau.<br />
Runner delivery will start <strong>in</strong> 2005<br />
with the rema<strong>in</strong><strong>in</strong>g units to be<br />
supplied over a period of two years.<br />
The Bureau of Reclamation is one of<br />
the key customers <strong>in</strong> the US market.<br />
VA TECH HYDRO is currently<br />
perform<strong>in</strong>g rehabilitation work for<br />
the Bureau at Grand Coulee, and<br />
our customer-pleas<strong>in</strong>g performance<br />
also had a positive <strong>in</strong>fluence on the<br />
Flam<strong>in</strong>g Gorge award.<br />
Technical data:<br />
Output: 48 MW<br />
Head: 130 m<br />
Speed: 400 rpm<br />
Runner diameter: 2,300 mm<br />
Mike Byrne<br />
Phone +1/704 943 4343<br />
mbyrne@<strong>va</strong><strong>tech</strong><strong>hydro</strong>.com<br />
COSTA RICA<br />
LA GARITA<br />
Performance tests successfully<br />
completed.<br />
The two Francis units of La Garita<br />
HPP, owned by INSTITUTO<br />
COSTARRICENSE DE ELECTRICIDAD<br />
(ICE), were extensively refurbished<br />
with<strong>in</strong> the framework of a jo<strong>in</strong>t refurbishment<br />
project between VA<br />
TECH HYDRO <strong>in</strong> Vevey and Vienna<br />
for the generators and Mexico for<br />
the control and govern<strong>in</strong>g systems.<br />
With respect to the turb<strong>in</strong>es, runners,<br />
distributors and shafts have<br />
been replaced, together with an<br />
overhaul of the hydraulic surfaces<br />
of all other components. New governors,<br />
cool<strong>in</strong>g systems and equipment<br />
for operation <strong>in</strong> synchronous<br />
condensers have also been <strong>in</strong>stalled.<br />
Follow<strong>in</strong>g the release of unit<br />
1 for commercial operation on February<br />
10, 2003 and unit 2 on December<br />
19, 2002, performance<br />
tests of the turb<strong>in</strong>es and generators<br />
were completed. The thermodynamic<br />
method used to measure the<br />
turb<strong>in</strong>e performance was applied<br />
under very special conditions. Indeed,<br />
a full performance test system<br />
for thermodynamic measure-