Assessment of Planning and Retail Issues - Renfrewshire Council
Assessment of Planning and Retail Issues - Renfrewshire Council
Assessment of Planning and Retail Issues - Renfrewshire Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROPOSED EXTENSIONS AT 11 ASSESSMENT OF PLANNING AND RETAIL ISSUES<br />
BRAEHEAD RETAIL PARK MAY 2010<br />
applications to address the flood risk issue. There are no health <strong>and</strong> safety<br />
implications, nor do the proposals give rise to any significant air quality<br />
implications, particularly as the location is readily accessible by public transport <strong>and</strong><br />
the traffic generating effects <strong>of</strong> the developments are expected to be very modest.<br />
2.31 Finally, as regards the ‘C’ criteria relating to infrastructure requirements, the<br />
transport assessment <strong>and</strong> drainage reports submitted with the applications set out<br />
the provision being made to address the infrastructure requirements <strong>of</strong> the<br />
proposals.<br />
2.32 Consequently it is considered that the proposals satisfy the criteria set down in<br />
Strategic Policy 9 <strong>of</strong> the Structure Plan, <strong>and</strong> thus do not constitute a departure<br />
from the plan.<br />
Local Plan Policy<br />
2.33 The <strong>Renfrewshire</strong> Local Plan was adopted in 2006. It recognises a hierarchy <strong>of</strong><br />
town centres comprising strategic town centres <strong>and</strong> secondary centres,<br />
neighbourhood shops, out <strong>of</strong> centre retailing, <strong>and</strong> - as a separate category - the<br />
Braehead Regional Shopping Centre <strong>and</strong> Leisure Centre. The plan recognises that<br />
Braehead is ‘not currently included in the Structure Plan’s Network <strong>of</strong> Town<br />
Centres’, <strong>and</strong> that ‘while the non-retail development on Renfrew Riverside will be<br />
encouraged, the role <strong>and</strong> function <strong>of</strong> the regional shopping centre will be<br />
monitored by the Structure Plan Joint Committee’.<br />
2.34 The local plan pre-dates the designation <strong>of</strong> Braehead as a Commercial Centre in<br />
the Structure Plan <strong>and</strong> the adjusted policies associated with that designation. It<br />
refers to Braehead as an out-<strong>of</strong>-centre retail location, which is no longer correct.<br />
2.35 Paragraph 7.11 in the Local Plan confirms the policy objective <strong>of</strong> maintaining the<br />
regional centre at Braehead. There are four policies <strong>of</strong> direct relevance to the<br />
current proposals - policies R1, R2, R13 <strong>and</strong> R16.<br />
2.36 Policy R1 states that town centre uses will be directed to the strategic <strong>and</strong><br />
secondary centres in <strong>Renfrewshire</strong>, <strong>and</strong> that all proposals for town centre uses will<br />
be considered against the criteria specified in Table R1. Policy R2 states that<br />
‘significant’ shopping developments <strong>of</strong> more than 2,000 square metres <strong>of</strong><br />
comparison floorspace will be directed to the strategic town centres to support<br />
their vitality <strong>and</strong> viability, <strong>and</strong> will be assessed against relevant Structure Plan