general information 1.3 Comments<br />
Until the year 2020 it is planned to be able to import capacity from directions:<br />
South and West – DE/CZ/SK – 2500 MW<br />
North – S – 600 MW<br />
East – LT – 1000 MW, UA – 220 MW<br />
The existing and planned interconnection are shown on Fig. 1<br />
DE<br />
VI<br />
E<br />
EI<br />
S<br />
HA<br />
G<br />
SE<br />
CZ<br />
Fig. 1 Existing and Planned Interconnections with Polish neighbouring transmission systems.<br />
PORTUGAL (pt)<br />
KR<br />
A<br />
ST<br />
O<br />
PL / BA<br />
E C<br />
MI<br />
K<br />
AL<br />
B NO<br />
S<br />
SL<br />
K<br />
DB<br />
N<br />
WI PB<br />
E KO O PB<br />
P O<br />
BU PB<br />
J O<br />
LI<br />
S<br />
VA<br />
R<br />
BY<br />
C /CZE<br />
LE<br />
M<br />
RZE<br />
GENERAL INFORMATION<br />
The National Electricity System (SEN) can be divided into five major functions: generation, transmission,<br />
distribution, supply and operation of the electricity market. Each of these functions is operated<br />
independently, from a legal, organisational and decision-making standpoint, subject to certain exceptions.<br />
energy government dept. (dge)<br />
generation<br />
conventional<br />
regime (pro)<br />
special<br />
regime (pre)<br />
SK<br />
EL<br />
K<br />
NA<br />
R<br />
KR<br />
I<br />
LT<br />
AL<br />
Y<br />
UA<br />
CH<br />
A<br />
BLR<br />
RO<br />
S<br />
national electricity system (sen)<br />
public service of<br />
electric grid (resp)<br />
transmission<br />
system<br />
operator (tso)<br />
very high voltage<br />
(rnt)<br />
distribution<br />
system<br />
operator (dso)<br />
high/medium voltage<br />
(rnd)<br />
low voltage<br />
(rndbt)<br />
Grids<br />
voltag 75<br />
0 k V<br />
Phase-shifter<br />
40<br />
0 k V 22<br />
0 k V D C<br />
Back-to-Back Station<br />
Interconnection Planned to realisation<br />
Existing interconnection<br />
Planned interconnection<br />
indep. regulatory entity (erse)<br />
supply<br />
free, subject<br />
to license<br />
last resource<br />
supplier<br />
market<br />
operator<br />
<strong>Power</strong> <strong>Statistics</strong> – <strong>2010</strong> <strong>Edition</strong> – <strong>Full</strong> <strong>Report</strong> 43