Affordable <strong>Housing</strong> Policy<br />

4.5 Supplementary <strong>Plan</strong>ning Guidance (SPG) was approved in January 2009 in relation<br />

to the method of delivering the <strong>Council</strong>’s Affordable <strong>Housing</strong> Policy. By then, the<br />

economic downturn was underway and there has been a severe reduction in<br />

house-building activity by the private sector. In the light of this, the <strong>Council</strong> is<br />

undertaking a review of the Affordable <strong>Housing</strong> Policy and SPG with a view to<br />

reducing the threshold for the size of sites which would come within the scope of<br />

the policy. This would extend the requirement to provide an element of affordable<br />

housing on smaller sites, on which developers appear to be concentrating their<br />

resources in the current economic climate. In August <strong>2010</strong>, the Scottish<br />

Government published PAN2/<strong>2010</strong> Affordable <strong>Housing</strong> and <strong>Housing</strong> Land Audits<br />

which replaces the old PAN74 and appendix to SPP3 and this will be taken into<br />

account as part of the <strong>Council</strong>’s review of the Affordable <strong>Housing</strong> Policy and<br />

subsequent SPG.<br />

<strong>Strategic</strong> Initiatives for Residential-led Regeneration (SIRRs)<br />

4.6 In addition to the base housing requirement, <strong>Falkirk</strong> <strong>Council</strong>’s Structure <strong>Plan</strong> and<br />

Local <strong>Plan</strong> Finalised Draft (deposit version) have indicated four locations - <strong>Strategic</strong><br />

Initiatives for Residential-led Regeneration (SIRRs) - where residential development<br />

will be encouraged to assist regeneration:<br />

4.7 • Banknock and Haggs,<br />

• Bo’ness Foreshore,<br />

• Whitecross,<br />

• Slamannan.<br />

4.8 These locations offer the potential for large-scale development in areas that have<br />

lacked investment to date. Each location does, however, have particular<br />

constraints in terms of physical infrastructure. The provision of social infrastructure<br />

and, in some cases, economic development opportunities, will also be essential to<br />

secure regeneration. Development will be conditional on the provision of a<br />

comprehensive master plan for the areas concerned, the provision of the necessary<br />

infrastructure through a co-ordinated approach to developer contributions,<br />

appropriate phasing and satisfactory environmental assessments.<br />

4.9 Three of the four SIRRs offer real potential for affordable housing land to be made<br />

available through the Affordable <strong>Housing</strong> Policy by working in partnership with the<br />

developers to ensure that mixed tenure communities are incorporated within each<br />

of the master plans. At the time the Bo’ness SIRR was declared there was no<br />

expectation that affordable housing would be part of its overall vision, however, the<br />

downturn in the housing markets now means that this position will need to be<br />

reviewed. During the period of this SHIP, progress on each of the three SIRRs<br />

which are expected to deliver affordable housing will be monitored and reported on<br />

to ensure necessary resources are programmed and allocated to meet affordable<br />

housing requirements.<br />