Affordable <strong>Housing</strong> Policy<br />
4.5 Supplementary <strong>Plan</strong>ning Guidance (SPG) was approved in January 2009 in relation<br />
to the method of delivering the <strong>Council</strong>’s Affordable <strong>Housing</strong> Policy. By then, the<br />
economic downturn was underway and there has been a severe reduction in<br />
house-building activity by the private sector. In the light of this, the <strong>Council</strong> is<br />
undertaking a review of the Affordable <strong>Housing</strong> Policy and SPG with a view to<br />
reducing the threshold for the size of sites which would come within the scope of<br />
the policy. This would extend the requirement to provide an element of affordable<br />
housing on smaller sites, on which developers appear to be concentrating their<br />
resources in the current economic climate. In August <strong>2010</strong>, the Scottish<br />
Government published PAN2/<strong>2010</strong> Affordable <strong>Housing</strong> and <strong>Housing</strong> Land Audits<br />
which replaces the old PAN74 and appendix to SPP3 and this will be taken into<br />
account as part of the <strong>Council</strong>’s review of the Affordable <strong>Housing</strong> Policy and<br />
subsequent SPG.<br />
<strong>Strategic</strong> Initiatives for Residential-led Regeneration (SIRRs)<br />
4.6 In addition to the base housing requirement, <strong>Falkirk</strong> <strong>Council</strong>’s Structure <strong>Plan</strong> and<br />
Local <strong>Plan</strong> Finalised Draft (deposit version) have indicated four locations - <strong>Strategic</strong><br />
Initiatives for Residential-led Regeneration (SIRRs) - where residential development<br />
will be encouraged to assist regeneration:<br />
4.7 • Banknock and Haggs,<br />
• Bo’ness Foreshore,<br />
• Whitecross,<br />
• Slamannan.<br />
4.8 These locations offer the potential for large-scale development in areas that have<br />
lacked investment to date. Each location does, however, have particular<br />
constraints in terms of physical infrastructure. The provision of social infrastructure<br />
and, in some cases, economic development opportunities, will also be essential to<br />
secure regeneration. Development will be conditional on the provision of a<br />
comprehensive master plan for the areas concerned, the provision of the necessary<br />
infrastructure through a co-ordinated approach to developer contributions,<br />
appropriate phasing and satisfactory environmental assessments.<br />
4.9 Three of the four SIRRs offer real potential for affordable housing land to be made<br />
available through the Affordable <strong>Housing</strong> Policy by working in partnership with the<br />
developers to ensure that mixed tenure communities are incorporated within each<br />
of the master plans. At the time the Bo’ness SIRR was declared there was no<br />
expectation that affordable housing would be part of its overall vision, however, the<br />
downturn in the housing markets now means that this position will need to be<br />
reviewed. During the period of this SHIP, progress on each of the three SIRRs<br />
which are expected to deliver affordable housing will be monitored and reported on<br />
to ensure necessary resources are programmed and allocated to meet affordable<br />
housing requirements.<br />