6.5 Recommendations and Follow-Up Actions<br />

Landfill Cap<br />

Continue operation of the landfill gas treatment system to maintain landfill gas levels remain below<br />

regulatory standards. Continue to inspect and monitor the OU 2 Landfills in accordance with the<br />

Preliminary Draft Closure Operation and Maintenance Plan, Operable Unit 2 Landfills (Shaw, 2006a).<br />

In the FS Addendum currently in development for <strong>Site</strong> 39, consideration is being given to placing<br />

excavated soils on top of the existing cover on Cell E and then placing a new engineered cover.<br />

Groundwater Treatment<br />

The OU 2 Groundwater Remedy should continue to be implemented as designed until either aquifer<br />

cleanup levels are reached or the next technical assessment is conducted. Adjustments to system<br />

operation may be conducted to maximize extraction and treatment of contaminants while maintaining<br />

capture of the plume.<br />

6.6 Protectiveness Statement<br />

The remedy will be protective of human health and the environment upon completion, and in the interim,<br />

exposure pathways that could result in unacceptable risks are being controlled because of the presence of<br />

Monterey County <strong>Ord</strong>inance 4011 and the CRUP.<br />

<strong>Final</strong><br />

6-7<br />

FORMER FT ORD 5YR REVIEW 2007_FINAL United States Department of the Army

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!