Final Second Five-Year Review Report Fort Ord Superfund Site ...
Final Second Five-Year Review Report Fort Ord Superfund Site ...
Final Second Five-Year Review Report Fort Ord Superfund Site ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
HydroGeoLogic, Inc. (HGL), 2005. <strong>Final</strong> 2004 Annual Groundwater Monitoring <strong>Report</strong> and Quarterly<br />
Groundwater Monitoring <strong>Report</strong>, Quarter 4 Operable Unit 1, Fritzsche Army Airfield Fire Drill Area,<br />
Former <strong>Fort</strong> <strong>Ord</strong>, California. August.<br />
_____, 2006a. <strong>Final</strong> 2005 Annual and 4 th Quarter Groundwater Monitoring <strong>Report</strong> Operable Unit 1,<br />
Fritzsche Army Airfield Fire Drill Area, Former <strong>Fort</strong> <strong>Ord</strong>, California. October.<br />
_____, 2006b. First Quarter 2006 Groundwater Monitoring <strong>Report</strong>. Letter to Ms. Gail Youngblood <strong>Fort</strong><br />
<strong>Ord</strong> Base Realignment and Closure Office, US Army. December.<br />
_____, 2006c. Technical Memorandum Former <strong>Fort</strong> <strong>Ord</strong> OU-1 Source Area Groundwater Remediation<br />
Status/Rebound Evaluation Plan Fritzsche Army Airfield Fire Drill Area, Former <strong>Fort</strong> <strong>Ord</strong>, California.<br />
January.<br />
_____, 2007a. <strong>Second</strong> Quarter 2006 Groundwater Monitoring <strong>Report</strong>. Letter to Ms. Gail Youngblood<br />
<strong>Fort</strong> <strong>Ord</strong> Base Realignment and Closure Office, US Army. February.<br />
_____, 2007b. Third Quarter 2006 Groundwater Monitoring <strong>Report</strong>. Letter to Ms. Gail Youngblood <strong>Fort</strong><br />
<strong>Ord</strong> Base Realignment and Closure Office, US Army.<br />
_____, 2007c. Draft Interim Hydraulic Control Pilot Project Evaluation <strong>Report</strong>, Operable Unit 1,<br />
Fritzsche Army Airfield Fire Drill Area. Prepared for USACE. March 30.<br />
IT Corp, 1999b. Draft <strong>Final</strong> Remedial Action Confirmation <strong>Report</strong>, <strong>Site</strong> 31 Remedial Action, Basewide<br />
Remedial <strong>Site</strong>s, <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. April 29.<br />
_____, 1999c. Draft <strong>Final</strong> Remedial Action Confirmation <strong>Report</strong> and Post-Remediation Health Risk<br />
Assessment, <strong>Site</strong> 12 Remedial Action, <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. June 1.<br />
_____, 1999d. Groundwater Remedial Action Work Plan, Operable Unit 2 Groundwater Remedy System<br />
Expansion. Prepared for USACE. December.<br />
_____, 2000b. <strong>Final</strong> Remedial Action Confirmation <strong>Report</strong> and Post-Remediation Health Risk<br />
Assessment, Revision 0, <strong>Site</strong> 3 Remedial Action, <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. August 8.<br />
_____, 2000c Remedial Action Confirmation <strong>Report</strong>, <strong>Site</strong> 39, Ranges 24 And 25 And Post-Remediation<br />
Risk Assessment <strong>Site</strong> 39, Ranges 24, 25, 26 , <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. March 1.<br />
_____, 2001a. Draft Remedial Action Confirmation <strong>Report</strong> And Post-Remediation Screening Risk<br />
Evaluation Area A, Operable Unit 2 Landfills. Prepared for USACE. April 30.<br />
MACTEC Engineering & Consulting, Inc. (MACTEC), 2004. <strong>Final</strong> Track 1 <strong>Ord</strong>nance and Explosives<br />
Remedial Investigation/Feasibility Study, Former <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. June 21.<br />
_____, 2005. <strong>Final</strong> RCRA Closure Plan, Range 36A, Solid Waste Management Unit (FTO-016), Former<br />
<strong>Fort</strong> <strong>Ord</strong>, California. May 20.<br />
_____, 2006a. Interim Action Confirmation <strong>Report</strong> IA Areas 39A HA-80 and 39A HA-85 <strong>Site</strong> 39A, East<br />
Garrison Ranges Former <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. March 7.<br />
_____, 2006b. <strong>Final</strong> Operable Unit Carbon Tetrachloride Plume Groundwater Remedial<br />
Investigation/Feasibility Study, Former <strong>Fort</strong> <strong>Ord</strong>, California, Volume I – Remedial Investigation; Volume<br />
II – Human Health Risk Assessment; Volume III – Feasibility Study. Prepared for USACE. May.<br />
<strong>Final</strong><br />
20-3<br />
FORMER FT ORD 5YR REVIEW 2007_FINAL United States Department of the Army