15.5 Recommendations and Follow-Up Actions<br />

The remaining explosive risks at SCAs at MRS-Ranges 43-48 should be evaluated under the MR RI/FS<br />

program. MEC remediation at Range 30A should be evaluated as a component of the Track 3 MR RI/FS.<br />

15.6 Protectiveness Statement<br />

The interim remedy will be protective of human health and the environment in the short-term because<br />

exposure pathways that could result in unacceptable risks are being controlled by an existing fence. A<br />

long-term protectiveness determination is deferred and cannot be made until further information is<br />

obtained. Further information will be obtained by completing the interim remedy and comparing them<br />

with the requirements stated in the Interim ROD.<br />

<strong>Final</strong><br />

15-4<br />

FORMER FT ORD 5YR REVIEW 2007_FINAL United States Department of the Army

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!