26.10.2013 Views

Final Second Five-Year Review Report Fort Ord Superfund Site ...

Final Second Five-Year Review Report Fort Ord Superfund Site ...

Final Second Five-Year Review Report Fort Ord Superfund Site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

_____, 1996i. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 8 – Range 49 (Molotov Cocktail Range),<br />

<strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. August 26.<br />

_____, 1996j. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 10 – Burn Pit, <strong>Fort</strong> <strong>Ord</strong>, California. Prepared<br />

for USACE. August 30.<br />

_____, 1996l. Draft <strong>Final</strong> Operation & Maintenance Manual OU1, Groundwater Treatment System,<br />

<strong>Fort</strong> <strong>Ord</strong>. Prepared for USACE. November 12.<br />

_____, 1997a. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 6 -Range 39 (Abandoned Car Dump), <strong>Fort</strong> <strong>Ord</strong>,<br />

California. Prepared for USACE. January 2.<br />

_____, 1997d. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 41 - Crescent Bluff Fire Drill Area, <strong>Fort</strong> <strong>Ord</strong>,<br />

California. Prepared for USACE. February 4.<br />

_____, 1997f. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 39B – Inter-Garrison <strong>Site</strong>, <strong>Fort</strong> <strong>Ord</strong>, California.<br />

Prepared for USACE. April 2.<br />

_____, 1997i. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 1 - <strong>Ord</strong> Village Sewage Treatment Plant,<br />

<strong>Fort</strong> <strong>Ord</strong>, California<br />

_____, 1998a. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 32 – East Garrison Sewage Treatment Plant,<br />

<strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. March 5.<br />

_____, 1998b. The Interim Action Confirmation <strong>Report</strong>, Outfall 15, Former <strong>Fort</strong> <strong>Ord</strong>, California.<br />

Prepared for USACE. September 3.<br />

_____, 1998c. Draft <strong>Final</strong> Additional Ecological Risk Evaluations, <strong>Site</strong> 3 - Beach Trainfire Ranges,<br />

Former <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. October 14.<br />

_____, 1998d. Interim Action Confirmation <strong>Report</strong>, <strong>Site</strong> 39A – East Garrison Ranges, Former <strong>Fort</strong> <strong>Ord</strong>,<br />

California. Prepared for USACE. October 16.<br />

_____, 1999. Draft <strong>Final</strong>, Carbon Tetrachloride Investigation <strong>Report</strong>, <strong>Fort</strong> <strong>Ord</strong>, California. Prepared<br />

for USACE. November 10.<br />

_____, 2000. Draft <strong>Final</strong> Literature <strong>Review</strong> <strong>Report</strong>, <strong>Ord</strong>nance and Explosives Remedial<br />

Investigation/Feasibility Study, Former <strong>Fort</strong> <strong>Ord</strong>, California. January 2.<br />

Harding ESE, 2002 Draft <strong>Final</strong> Field Investigation and Data <strong>Review</strong>, Solid Waste Management Units,<br />

<strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. July 30.<br />

_____, 2003a. <strong>Final</strong> Closure Plan, DRMO PCB Storage Building T-111, Former <strong>Fort</strong> <strong>Ord</strong>, California.<br />

Prepared for USACE. February 7.<br />

_____, 2003b. <strong>Final</strong> RCRA Closure Certification <strong>Report</strong> DRMO PCB Storage Building T-111 (Solid<br />

Waste Management Unit FTO-009), Former <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. September 23.<br />

_____ and IT Corp (Harding ESE/IT), 2001a. Work Plan, Revision 0, Operation and Maintenance,<br />

Groundwater Treatment Systems, Former <strong>Fort</strong> <strong>Ord</strong>, California. Prepared for USACE. March 14.<br />

_____ and IT Corp (Harding ESE/IT), 2001b. Basewide Range Assessment Work Plan and Quality<br />

Control Plan, Small Arms and Multi-Use Ranges, <strong>Fort</strong> <strong>Ord</strong>, California. January 15.<br />

<strong>Final</strong><br />

20-2<br />

FORMER FT ORD 5YR REVIEW 2007_FINAL United States Department of the Army

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!