03.01.2014 Views

NetSure ITM Installation Manual - Gruber Power

NetSure ITM Installation Manual - Gruber Power

NetSure ITM Installation Manual - Gruber Power

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Electrical Connections<br />

Figure 12 DC Output Connections<br />

DISTRIBUTION CIRCUIT BREAKERS<br />

DC UPS MODULE WITH<br />

TOP FEED DC DISTRIBUTION<br />

DC UPS MODULE WITH<br />

BOTTOM FEED DC DISTRIBUTION<br />

1”<br />

DC Output (-48Vdc)<br />

(per distribution position)<br />

to distribution device busbar<br />

1"<br />

1”<br />

DC Output Return<br />

(per distribution position)<br />

to ground/return busbars<br />

1”<br />

Terminals are 3/8” (M10) studs.<br />

Recommended Torque is 407-434 in-lbs (46-49 Nm).<br />

DC UPS MODULE WITH<br />

TOP FEED DC DISTRIBUTION<br />

DISTRIBUTION FUSES<br />

(optional)<br />

DC UPS MODULE WITH<br />

BOTTOM FEED DC DISTRIBUTION<br />

1.5”<br />

1 .75"<br />

1 .75"<br />

1.7 5"<br />

1 .75"<br />

1 .75"<br />

DC Output (-48Vdc)<br />

(per distribution position)<br />

to distribution device busbar<br />

1 .75"<br />

1.5”<br />

DC Output Return<br />

(per distribution position)<br />

to ground/return busbars<br />

Terminals are 1/2” (M12) studs.<br />

Recommended Torque is 690-743 in-lbs (78-84 Nm).<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!