NetSure ITM Installation Manual - Gruber Power
NetSure ITM Installation Manual - Gruber Power
NetSure ITM Installation Manual - Gruber Power
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Electrical Connections<br />
Figure 12 DC Output Connections<br />
DISTRIBUTION CIRCUIT BREAKERS<br />
DC UPS MODULE WITH<br />
TOP FEED DC DISTRIBUTION<br />
DC UPS MODULE WITH<br />
BOTTOM FEED DC DISTRIBUTION<br />
1”<br />
DC Output (-48Vdc)<br />
(per distribution position)<br />
to distribution device busbar<br />
1"<br />
1”<br />
DC Output Return<br />
(per distribution position)<br />
to ground/return busbars<br />
1”<br />
Terminals are 3/8” (M10) studs.<br />
Recommended Torque is 407-434 in-lbs (46-49 Nm).<br />
DC UPS MODULE WITH<br />
TOP FEED DC DISTRIBUTION<br />
DISTRIBUTION FUSES<br />
(optional)<br />
DC UPS MODULE WITH<br />
BOTTOM FEED DC DISTRIBUTION<br />
1.5”<br />
1 .75"<br />
1 .75"<br />
1.7 5"<br />
1 .75"<br />
1 .75"<br />
DC Output (-48Vdc)<br />
(per distribution position)<br />
to distribution device busbar<br />
1 .75"<br />
1.5”<br />
DC Output Return<br />
(per distribution position)<br />
to ground/return busbars<br />
Terminals are 1/2” (M12) studs.<br />
Recommended Torque is 690-743 in-lbs (78-84 Nm).<br />
23