NetSure ITM Installation Manual - Gruber Power
NetSure ITM Installation Manual - Gruber Power
NetSure ITM Installation Manual - Gruber Power
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SUITABLE F O R MO UNT ING O N CO NCRET E<br />
O R O THER NO N-COMBUST IBLE SURF ACE O NLY.<br />
Electrical Connections<br />
Figure 20 Module-Module Interconnect Busbars (DC UPS Module with Top Feed DC Distribution)<br />
Ground/Return<br />
Busbar<br />
-48Vdc Busbar<br />
Hardware Build-Up<br />
M10 Nut<br />
(electro zinc treatment with bright chromate)<br />
M10 Belleville Lock Washer<br />
DIN 6796-10.5 STEEL<br />
(electro zinc treatment with bright chromate)<br />
Torque to 418 in-lbs (47.3 Nm)<br />
-48Vdc<br />
Busbar<br />
-48Vdc<br />
Busbar<br />
Ground/Return Busbar<br />
Hardware Build-Up<br />
M10 x 30mm Bolt<br />
(electro zinc treatment with bright chromate)<br />
M10 Belleville Lock Washer<br />
DIN 6796-10.5 STEEL<br />
(electro zinc treatment with bright chromate)<br />
Torque to 418 in-lbs (47.3 Nm)<br />
Battery Compartment and Base<br />
Removed in Illustrations for Clarity<br />
Ground/Return Interconnect Busbar<br />
(can be installed on left and/or<br />
right side of module)<br />
-48Vdc Interconnect Busbar<br />
(can be installed on left and/or<br />
right side of module)<br />
33