Table B-12: Daylighting Calculations by Site<br />

LPOE Site Name<br />

Total Skylight<br />

Area (ft 2 )<br />

Daylighting<br />

Initial Cost<br />

($)<br />

Electricity<br />

Saved<br />

(kWh/yr)<br />

Natural Gas<br />

Saved<br />

(therms/yr)<br />

Utility<br />

Savings<br />

($/yr)<br />

Daylighting<br />

Payback<br />

Period (yrs)<br />

Highgate Springs 1, VT 0 $0 0 (0.0) $0 9<br />

Highgate Springs 2, VT 951 $32,210 41113 (850.1) $2,211 15<br />

Highgate Springs 3, VT 184 $5,751 6644 (164.9) $592 10<br />

Blaine, WA 1,676 $50,389 59755 (635.4) $3,053 17<br />

Danville, WA 382 $11,590 16521 (190.7) $945 12<br />

Laurier, WA 443 $13,512 19317 (221.5) $1,350 10<br />

Mataline Falls. WA 0 $0 0 (0.0) $0 24<br />

Oroville, WA 0 $2 3 (0.0) 0 (16)<br />

Point Robert, WA 1,422 $43,680 62869 (710.4) $2,613 17<br />

Sumas, WA 0 $1 1 (0.0) $0 13<br />

Blaine, WA 0 $1 1 (0.0) $0 16<br />

Blaine, WA 5,542 $162,654 190793 (2,100.8) $12,501 13<br />

Kenneth Ward, WA 886 $26,495 31399 (335.9) $2,180 12<br />

Total $846,453.00<br />

Therms/yr in red and in paratheses (xx.x) indicate additional natural gas will need<br />

to be purchased/consumed at some locations to compensate for heat loss<br />

through skylights. This extra cost was included in the Utility Savings and<br />

Daylighting Payback Period calculations.<br />

Note that each technology is recommended as part of the optimized solution for a<br />

site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />

an LPOE site to cost effectively generate more RE than the optimized solution<br />

indicates, but the life cycle costs would be higher.<br />

133