Table B-14: Calculations for Biomass Gasification of Dry Waste<br />
for Heat and Electric Power<br />
LPOE Site Name<br />
Biomass<br />
Gasifier<br />
Size<br />
(MBtu/h)<br />
Biomass<br />
Gasifier<br />
Cogen<br />
Size<br />
(kW)<br />
Biomass<br />
Initial<br />
Cost ($)<br />
Biomass<br />
Natural<br />
Gas<br />
Savings<br />
(therms/yr)<br />
Biomass<br />
Gasifier<br />
Electric<br />
Delivery<br />
(kWh/yr)<br />
Biomass<br />
Gasifier<br />
Annual<br />
Utility<br />
Cost<br />
Savings<br />
($/yr)<br />
Tons<br />
of<br />
Fuel<br />
Used<br />
Fuel<br />
Cost<br />
($)<br />
Biomass<br />
Gasifier<br />
O&M<br />
Cost($/yr)<br />
Biomass<br />
Gasifier<br />
Payback<br />
Period<br />
(yrs)<br />
West Berkshire,VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Derby Line, VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Beecher Falls, VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Canaan, VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
East Richford, VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Richford, VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Alburg, VT (Joint<br />
ownership) 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Highgate Springs 1,<br />
VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Highgate Springs 2,<br />
VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Highgate Springs 3,<br />
VT 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Blaine, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Danville, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Laurier, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Mataline Falls. WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Oroville, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Point Robert, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Sumas, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Blaine, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Blaine, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Kenneth Ward, WA 0 0 $0 0 0 $0 0 $0 $0 n/a<br />
Totals $272,264<br />
Note that each technology is recommended as part of the optimized solution for a<br />
site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />
an LPOE site to cost effectively generate more RE than the optimized solution<br />
indicates, but the life cycle costs would be higher.<br />
141