Table C-1: Initial Cost of RE Technology (with incentives)<br />

LPOE Site Name<br />

PV Initial<br />

Cost<br />

w/incentives<br />

Wind<br />

Initial<br />

Cost w/<br />

incentives<br />

Solar Vent<br />

Preheat<br />

Cost<br />

w/incentives<br />

Solar Water<br />

Heating<br />

Cost<br />

w/incentives<br />

Biomass<br />

Gasifier<br />

Cost<br />

w/incentives<br />

Daylighting<br />

Cost<br />

w/incentives<br />

Total Initial<br />

Cost<br />

Derby Line, VT $1 $0 $37,486 $18,289 $5 $24,057 $79,838<br />

Beecher Falls, VT $1 $0 $9,706 $9,667 $5 $11,985 $31,364<br />

Canaan, VT $1 $0 $4,385 $6,384 $5 $6,615 $17,390<br />

East Richford, VT $1 $0 $8,049 $6,421 $5 $10,725 $25,201<br />

Richford, VT $1 $0 $7,534 $8,487 $5 $10,231 $26,258<br />

Alburg, VT (Joint<br />

ownership) $1,184 $0 $5,841 $1,429 $5 $4,730 $13,189<br />

Highgate Springs 1, VT $1 $0 $1,683 $107 $5 $0 $1,796<br />

Highgate Springs 2, VT $1 $0 $41,920 $157,308 $131,374 $32,210 $362,813<br />

Highgate Springs 3, VT $1 $0 $3,751 $5,187 $5 $5,751 $14,695<br />

Blaine, WA $1 $0 $71,647 $43,913 $6 $50,389 $165,957<br />

Danville, WA $1 $0 $17,493 $6,794 $6 $11,590 $35,884<br />

Laurier, WA $1 $0 $8,754 $2,392 $6 $13,512 $24,665<br />

Mataline Falls. WA $1 $0 $7,896 $2,731 $6 $0 $10,634<br />

Oroville, WA $1 $0 $0 $9,739 $6 $2 $9,747<br />

Point Robert, WA $1 $0 $70,150 $29,280 $6 $43,680 $143,116<br />

Sumas, WA $1 $0 $23,711 $12,886 $6 $1 $36,604<br />

Blaine, WA $1 $0 $71,585 $26,643 $6 $1 $98,235<br />

Blaine, WA $1 $0 $55,052 $0 $6 $162,654 $217,713<br />

Kenneth Ward, WA $1 $0 $35,706 $0 $6 $26,495 $62,208<br />

$24,799,302.00<br />

*Anaerobic digestor and solar thermal are not cost effective with incentives.<br />

Note that each technology is recommended as part of the optimized solution for a<br />

site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />

an LPOE site to cost effectively generate more RE than the optimized solution<br />

indicates, but the life cycle costs would be higher.<br />

162