Table C-1: Initial Cost of RE Technology (with incentives)<br />
LPOE Site Name<br />
PV Initial<br />
Cost<br />
w/incentives<br />
Wind<br />
Initial<br />
Cost w/<br />
incentives<br />
Solar Vent<br />
Preheat<br />
Cost<br />
w/incentives<br />
Solar Water<br />
Heating<br />
Cost<br />
w/incentives<br />
Biomass<br />
Gasifier<br />
Cost<br />
w/incentives<br />
Daylighting<br />
Cost<br />
w/incentives<br />
Total Initial<br />
Cost<br />
Derby Line, VT $1 $0 $37,486 $18,289 $5 $24,057 $79,838<br />
Beecher Falls, VT $1 $0 $9,706 $9,667 $5 $11,985 $31,364<br />
Canaan, VT $1 $0 $4,385 $6,384 $5 $6,615 $17,390<br />
East Richford, VT $1 $0 $8,049 $6,421 $5 $10,725 $25,201<br />
Richford, VT $1 $0 $7,534 $8,487 $5 $10,231 $26,258<br />
Alburg, VT (Joint<br />
ownership) $1,184 $0 $5,841 $1,429 $5 $4,730 $13,189<br />
Highgate Springs 1, VT $1 $0 $1,683 $107 $5 $0 $1,796<br />
Highgate Springs 2, VT $1 $0 $41,920 $157,308 $131,374 $32,210 $362,813<br />
Highgate Springs 3, VT $1 $0 $3,751 $5,187 $5 $5,751 $14,695<br />
Blaine, WA $1 $0 $71,647 $43,913 $6 $50,389 $165,957<br />
Danville, WA $1 $0 $17,493 $6,794 $6 $11,590 $35,884<br />
Laurier, WA $1 $0 $8,754 $2,392 $6 $13,512 $24,665<br />
Mataline Falls. WA $1 $0 $7,896 $2,731 $6 $0 $10,634<br />
Oroville, WA $1 $0 $0 $9,739 $6 $2 $9,747<br />
Point Robert, WA $1 $0 $70,150 $29,280 $6 $43,680 $143,116<br />
Sumas, WA $1 $0 $23,711 $12,886 $6 $1 $36,604<br />
Blaine, WA $1 $0 $71,585 $26,643 $6 $1 $98,235<br />
Blaine, WA $1 $0 $55,052 $0 $6 $162,654 $217,713<br />
Kenneth Ward, WA $1 $0 $35,706 $0 $6 $26,495 $62,208<br />
$24,799,302.00<br />
*Anaerobic digestor and solar thermal are not cost effective with incentives.<br />
Note that each technology is recommended as part of the optimized solution for a<br />
site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />
an LPOE site to cost effectively generate more RE than the optimized solution<br />
indicates, but the life cycle costs would be higher.<br />
162