Table B-16: Details of Solar Ventilation Air Preheating Calculations<br />

LPOE Site Name<br />

Alburg, VT (Joint<br />

ownership)<br />

SVP<br />

Ventilation<br />

Rate<br />

(CFM)<br />

Solar Vent<br />

Preheat<br />

Area (ft 2 )<br />

Annual Gas<br />

Savings<br />

(therms/yr)<br />

Initial Cost<br />

($)<br />

Annual Utility<br />

Cost Savings<br />

($/yr)<br />

Solar Vent<br />

Preheat<br />

Payback<br />

Period<br />

(yrs)<br />

1,24 261 477 $9,414 $1,904 5<br />

Highgate Springs 1, VT 323 0 0 $0 $0 5<br />

Highgate Springs 2, VT 4,729 2,087 3,806 $75,137 $7,667 10<br />

Highgate Springs 3, VT 640 199 362 $7,153 $727 10<br />

Blaine, WA 11,540 3,316 6,046 $119,379 $13,153 9<br />

Danville, WA 2,550 823 1,800 $29,612 $2,653 11<br />

Laurier, WA 1,679 406 888 $14,603 $2,737 5<br />

Mataline Falls. WA 1,547 0 0 $0 $0 17<br />

Oroville, WA 24,285 289 592 $10,413 $4,668 2<br />

Point Robert, WA 11,069 3,248 6,642 $116,913 $12,099 10<br />

Sumas, WA 4,060 0 0 $0 $0 19<br />

Blaine, WA 11,540 3,316 6,046 $119,367 $11,012 11<br />

Blaine, WA 32,791 0 0 $0 $0 18<br />

Kenneth Ward, WA 5,903 0 0 $0 $0 19<br />

Totals $404,658.00<br />

Note that each technology is recommended as part of the optimized solution for a<br />

site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />

an LPOE site to cost effectively generate more RE than the optimized solution<br />

indicates, but the life cycle costs would be higher.<br />

146