Appendices - GSA
Appendices - GSA
Appendices - GSA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table B-2: RE Use as Percentage of Total Energy Use by LPOE Site<br />
(without incentives)<br />
LPOE Site Name<br />
Base Case Energy<br />
Use (Mbtu/yr)<br />
RE Solutions Case<br />
Energy Use (Mbtu/yr)<br />
Renewable<br />
Energy Use (%)<br />
Pembina, ND 12,723 11,627 8.6%<br />
Laredo TX 2,469 2,264 8.3%<br />
McAllen, TX 2,810 2,576 8.3%<br />
Rio Grande City, TX 3,346 3,108 7.1%<br />
Nogales, AZ 8,039 7,485 6.9%<br />
Derby Line, VT 2,241 2,091 6.7%<br />
Bridge of the Americas, TX 19,742 18,554 6.0%<br />
Raymond, MT 7,866 7,401 5.9%<br />
Calexico West, CA 13,567 12,868 5.2%<br />
Convent, TX 5,731 5,454 4.8%<br />
Champlain, NY 35,654 33,994 4.7%<br />
Highgate Springs 2, VT 9,244 8,808 4.7%<br />
Nogales, AZ 11,804 11,310 4.2%<br />
Blaine, WA 10,592 10,151 4.2%<br />
Kenneth Ward, WA 1,830 1,756 4.0%<br />
Chief Mt, MT 5,885 5,750 2.3%<br />
Oroville, WA 4,818 4,759 1.2%<br />
Detroit Cargo, MI 14,848 14,688 1.1%<br />
TOTAL FOR ALL SITES<br />
(including ones with no RE<br />
Solutions)<br />
496,508 420,694 15.3%<br />
The following LPOE sites had no cost-effective RE solutions:<br />
• San Luis AZ (not built );<br />
• El Paso, TX (Leased);<br />
• Amb. Bridge, MI;<br />
• McAllen TX (not built);<br />
• Intl Bridge, MI;<br />
• Highgate Springs 1, VT;<br />
• Rooseville, MT;<br />
• Mataline Falls. WA;<br />
• Admin, TX (leased);<br />
• Sumas, WA.<br />
108