Table B-13: Wind Energy Calculations by Site<br />
LPOE Site Name<br />
Wind<br />
Capacity<br />
(kW)<br />
Wind Initial<br />
Cost ($)<br />
Wind<br />
Rebate ($)<br />
Wind Net<br />
Metering up<br />
to (kW)<br />
Wind Annual<br />
Energy<br />
Delivery<br />
(kWh/yr)<br />
Wind Annual<br />
Cost Savings<br />
($)<br />
Wind<br />
Annual<br />
O&M Cost<br />
($/yr)<br />
Wind<br />
Payback<br />
Period<br />
(yrs)<br />
Danville, WA 0 $0 $0 0 0 $0 $0 1,006<br />
Laurier, WA 0 $0 $0 0 0 $0 $0 671<br />
Mataline Falls. WA 0 $0 $0 0 0 $0 $0 (110,018)<br />
Oroville, WA 0 $0 $0 0 0 $0 $0 1,558<br />
Point Robert, WA 0 $0 $0 0 0 $0 $0 1,124<br />
Sumas, WA 0 $0 $0 100 0 $0 $0 149<br />
Blaine, WA 0 $0 $0 100 0 $0 $0 165<br />
Blaine, WA 0 $0 $0 100 0 $0 $0 129<br />
Kenneth Ward, WA 0 $0 $0 100 0 $0 $0 124<br />
Totals $472,874.00<br />
Note that each technology is recommended as part of the optimized solution for a<br />
site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />
an LPOE site to cost effectively generate more RE than the optimized solution<br />
indicates, but the life cycle costs would be higher.<br />
137