Table B-6: Initial Costs for RE Technologies by Site<br />
(without incentives)<br />
Wind Initial<br />
Cost ($)<br />
Solar<br />
Vent<br />
Preheat<br />
Cost ($)<br />
Solar<br />
Water<br />
Heating<br />
Cost ($)<br />
Biomass<br />
Gasifier<br />
Cost ($)<br />
Daylighting<br />
Cost ($)<br />
Total Initial<br />
Cost ($)<br />
St. John ND $0 $5,563 $0 $0 $0 $5,563<br />
Jamieson, NY $0 $1,823 $1,721 $0 $1,552 $5,097<br />
St. Francis, ME $0 $2,012 $2,184 $0 $0 $4,196<br />
St. Francis, ME $0 $901 $2,641 $0 $0 $3,542<br />
RR Inspection, TX $0 $0 $450 $0 $2,760 $3,210<br />
Highgate Springs 1, VT $1,911 $0 $0 $0 $0 $1,911<br />
Amb. Bridge, MI $0 $0 $0 $0 $0 $0<br />
Intl Bridge, MI $0 $0 $0 $0 $0 $0<br />
Oroville, WA $0 $0 $0 $0 $0 $0<br />
Rooseville, MT $0 $0 $0 $0 $0 $0<br />
Sumas, WA $0 $0 $0 $0 $0 $0<br />
San Luis AZ (not built) $0 $0 $0 $0 $0 $0<br />
McAllen TX (not built) $0 $0 $0 $0 $0 $0<br />
Mataline Falls. WA $0 $0 $0 $0 $0 $0<br />
PV and solar industrial process heat technology were not cost effective at any<br />
LPOE site without incentives. Zero initial cost indicates that the technology was<br />
not cost effective at the site.<br />
Note that each technology is recommended as part of the optimized solution for a<br />
site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />
an LPOE site to cost effectively generate more RE than the optimized solution<br />
indicates, but the life cycle costs would be higher.<br />
118