Table B-6: Initial Costs for RE Technologies by Site<br />

(without incentives)<br />

Wind Initial<br />

Cost ($)<br />

Solar<br />

Vent<br />

Preheat<br />

Cost ($)<br />

Solar<br />

Water<br />

Heating<br />

Cost ($)<br />

Biomass<br />

Gasifier<br />

Cost ($)<br />

Daylighting<br />

Cost ($)<br />

Total Initial<br />

Cost ($)<br />

St. John ND $0 $5,563 $0 $0 $0 $5,563<br />

Jamieson, NY $0 $1,823 $1,721 $0 $1,552 $5,097<br />

St. Francis, ME $0 $2,012 $2,184 $0 $0 $4,196<br />

St. Francis, ME $0 $901 $2,641 $0 $0 $3,542<br />

RR Inspection, TX $0 $0 $450 $0 $2,760 $3,210<br />

Highgate Springs 1, VT $1,911 $0 $0 $0 $0 $1,911<br />

Amb. Bridge, MI $0 $0 $0 $0 $0 $0<br />

Intl Bridge, MI $0 $0 $0 $0 $0 $0<br />

Oroville, WA $0 $0 $0 $0 $0 $0<br />

Rooseville, MT $0 $0 $0 $0 $0 $0<br />

Sumas, WA $0 $0 $0 $0 $0 $0<br />

San Luis AZ (not built) $0 $0 $0 $0 $0 $0<br />

McAllen TX (not built) $0 $0 $0 $0 $0 $0<br />

Mataline Falls. WA $0 $0 $0 $0 $0 $0<br />

PV and solar industrial process heat technology were not cost effective at any<br />

LPOE site without incentives. Zero initial cost indicates that the technology was<br />

not cost effective at the site.<br />

Note that each technology is recommended as part of the optimized solution for a<br />

site, and these sizes minimize life-cycle costs. In other words, it is possible for<br />

an LPOE site to cost effectively generate more RE than the optimized solution<br />

indicates, but the life cycle costs would be higher.<br />