FY14 RDT&E Project Portfolio - USCG - U.S. Coast Guard
FY14 RDT&E Project Portfolio - USCG - U.S. Coast Guard
FY14 RDT&E Project Portfolio - USCG - U.S. Coast Guard
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Arctic Shield 2014 Technology Demonstrations<br />
Mission Need: Expanded operational and resource capabilities assessments in the Arctic.<br />
<strong>Project</strong> Objectives:<br />
• Based on the evaluations of the technology types employed for Arctic<br />
Operations Support 2013, refine capabilities improvements to execution of<br />
<strong>Coast</strong> <strong>Guard</strong> missions in the Arctic.<br />
• Continue to nurture joint efforts and interagency cooperation between<br />
government sectors and civilian entities on the North Slope and abroad.<br />
• Integrate and assess potential of new technologies in enhancing <strong>Coast</strong><br />
<strong>Guard</strong> Arctic operations.<br />
• Facilitate and provide support to other Arctic projects in accomplishing<br />
their testing objectives.<br />
Key Milestone / Deliverable Schedule:<br />
<strong>Project</strong> Start……………………………………..………….............. Oct 13<br />
Preliminary Test Plans for Technology Demonstration and<br />
Operational Testing Finalized……………………..……………. Apr 14<br />
Site Visit to D17 and North Slope to Liaise and Survey<br />
Shoreside Test Locations……...………………………………….<br />
May14<br />
Load Equipment on CGC HEALY/Install Gear on North Slope… May 14<br />
Conduct Demonstration and Testing.………………………….… Jul 14<br />
Arctic Shield 2014 Operational Evaluation and Logistics<br />
Summary Report……………………………………………….. Oct 14<br />
Arctic Shield 2014 Technology Demonstration Video……..….. Oct 14<br />
<strong>Project</strong> End…………………………………………………………. Dec 14<br />
Sponsor:<br />
Stakeholder(s):<br />
<strong>Project</strong> #: Tier: RDC POC: CG-926 Domain Lead:<br />
6210 1<br />
Mr. Scot Tripp LCDR Anthony Erickson<br />
(860) 271-2680 (202) 475-3748<br />
Expected Benefit:<br />
Improve operational performance/efficiency/mission<br />
execution/resiliency<br />
Notes:<br />
CG-926<br />
D17, PAC-7<br />
<strong>Project</strong> will leverage other organizations with Arctic interests/efforts<br />
to the maximum extent possible.<br />
Follow on to 2012/2013 efforts.<br />
Indicates RDC product.<br />
UNCLAS/<strong>USCG</strong> Research & Development Center 11/6/2013<br />
Version date<br />
61