Arctic Shield 2014 Technology Demonstrations<br />

Mission Need: Expanded operational and resource capabilities assessments in the Arctic.<br />

<strong>Project</strong> Objectives:<br />

• Based on the evaluations of the technology types employed for Arctic<br />

Operations Support 2013, refine capabilities improvements to execution of<br />

<strong>Coast</strong> <strong>Guard</strong> missions in the Arctic.<br />

• Continue to nurture joint efforts and interagency cooperation between<br />

government sectors and civilian entities on the North Slope and abroad.<br />

• Integrate and assess potential of new technologies in enhancing <strong>Coast</strong><br />

<strong>Guard</strong> Arctic operations.<br />

• Facilitate and provide support to other Arctic projects in accomplishing<br />

their testing objectives.<br />

Key Milestone / Deliverable Schedule:<br />

<strong>Project</strong> Start……………………………………..………….............. Oct 13<br />

Preliminary Test Plans for Technology Demonstration and<br />

Operational Testing Finalized……………………..……………. Apr 14<br />

Site Visit to D17 and North Slope to Liaise and Survey<br />

Shoreside Test Locations……...………………………………….<br />

May14<br />

Load Equipment on CGC HEALY/Install Gear on North Slope… May 14<br />

Conduct Demonstration and Testing.………………………….… Jul 14<br />

Arctic Shield 2014 Operational Evaluation and Logistics<br />

Summary Report……………………………………………….. Oct 14<br />

Arctic Shield 2014 Technology Demonstration Video……..….. Oct 14<br />

<strong>Project</strong> End…………………………………………………………. Dec 14<br />

Sponsor:<br />

Stakeholder(s):<br />

<strong>Project</strong> #: Tier: RDC POC: CG-926 Domain Lead:<br />

6210 1<br />

Mr. Scot Tripp LCDR Anthony Erickson<br />

(860) 271-2680 (202) 475-3748<br />

Expected Benefit:<br />

Improve operational performance/efficiency/mission<br />

execution/resiliency<br />

Notes:<br />

CG-926<br />

D17, PAC-7<br />

<strong>Project</strong> will leverage other organizations with Arctic interests/efforts<br />

to the maximum extent possible.<br />

Follow on to 2012/2013 efforts.<br />

Indicates RDC product.<br />

UNCLAS/<strong>USCG</strong> Research & Development Center 11/6/2013<br />

Version date<br />

61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!