<strong>Coast</strong> <strong>Guard</strong> Break-Away Timer<br />
Mission Need: Capability to identify ship operators involved in Aids to Navigation (ATON) allisions resulting in<br />
significant financial loss for CG due to buoy repairs and replacements.<br />
<strong>Project</strong> Objectives:<br />
• Conduct research into past incidents and document requirements. Conduct<br />
market research into potential technologies.<br />
• Develop and test a proof-of-concept device that can be installed on smaller<br />
foam aids with mooring chains in locations that are prone to parting upon<br />
impact.<br />
• Ensure that the timer device is capable of recording the amount of time<br />
from impact to recovery of buoy.<br />
Key Milestone / Deliverable Schedule:<br />
<strong>Project</strong> Start………………………………………………………….. TBD<br />
Market Research Assessment: Break-Away Timers……. TBD+3 Mos.<br />
Develop Proof-of-Concepts…………………....…………… TBD+11 Mos.<br />
Test Proof-of-Concepts at Field Location..………............... TBD+21 Mos.<br />
Test Results Final Report………………………………… TBD+25 Mos.<br />
<strong>Project</strong> End…………………………………………………… TBD+28 Mos.<br />
Sponsor:<br />
Stakeholder(s):<br />
<strong>Project</strong> #: Tier: RDC POC: CG-926 Domain Lead:<br />
2014-1 3<br />
Mr. Alexander Balsley LCDR Anthony Erickson<br />
(860) 271-2854 (202) 475-3748<br />
Expected Benefit:<br />
Improve operational performance/efficiency/mission<br />
execution/resiliency<br />
Notes:<br />
CG-NAV<br />
Indicates RDC product.<br />
UNCLAS/<strong>USCG</strong> Research & Development Center 11/6/2013<br />
Version date<br />
95