Task 5 - Material Inspection: CBBEL will perform the following tasks further described in<br />

the attached proposal from Testing Service Corporation:<br />

• CBBEL will utilize Testing Service Corporation (TSC) for the material testing portions<br />

<strong>of</strong> this contract. In accordance with federally funded projects, Testing Service<br />

Corporation will provide Quality Assurance (QA) testing on-site as outlined by I DOT's<br />

Bureau <strong>of</strong> Material and Physical Research, and further described in the Construction<br />

Manual and Project Procedures Guide. lOOT is responsible for QA testing at the<br />

concrete and HMA plants.<br />

• The Resident Engineer provided by CBBEL will be familiar with the frequency <strong>of</strong> QA<br />

testing as required by lOOT as outlined in their Project Procedures Guide. The<br />

Resident Engineer will coordinate the QA material testing and review all required<br />

reports submitted by both the Contractor's QC sub-contractor and TSC for<br />

compliance with the project specifications.<br />

Task 6 - Record Drawings: CBBEL will perform the following tasks:<br />

• Modify contract drawings to reflect as-built conditions. The record drawings<br />

should be revised to depict field measurements <strong>of</strong> the completed work which is<br />

considered significant and provide the <strong>Village</strong> with the record plan submittal and<br />

all equipment operation/maintenance manuals within ninety (90) days <strong>of</strong> the<br />

project completion. Submittals shall include but are not limited to:<br />

• Two (2) full-size (24"x36") paper print record plan sets.<br />

• One (1) CD containing an electronic submittal <strong>of</strong> the as-built plans (.pdf format).<br />

Task 7 - Project Documentation: CBBEL will perform the following tasks:<br />

• In general, all documentation will be completed following lOOT's Construction<br />

Manual and Project Procedures Guide. The ICORS and MISTIC s<strong>of</strong>tware programs<br />

will be used for documentation and material RE Visuals, respectively.<br />

• Make all diary entries in ICORS recording Contractor hours on the job site, weather<br />

conditions, general and specific observations, daily activities, list <strong>of</strong> visiting <strong>of</strong>ficials,<br />

and documentation <strong>of</strong> the "traffic control drive-thru check" as outlined in the<br />

Construction Manual. Generate weekly reports using ICORS for distribution to I DOT,<br />

the <strong>Village</strong>, and the Contractor.<br />

• Prepare Change Orders and Pay Estimates using lOOT's ICORS s<strong>of</strong>tware for the<br />

<strong>Village</strong>'s approval.<br />

• Review and coordinate response to any RFI from the Contractor in a timely manner<br />

and maintain a separate file for each request.<br />

• Complete daily reports recording and documenting the quantities completed. All<br />

quantities shall be documented following the I DOT Construction Manual.<br />

GJS/gjs Page 4 <strong>of</strong> 6<br />

N:\PROPOSALS\ADMIN\2013\<strong>Huntley</strong>- Kreutzer Road.050313.doc