Proposal Review Detail • Category Continues ..<br />

Job Order Number: 015225.00<br />

Job Order Title: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>- aerobic digestor blowers<br />

Rec# CSI Number Mod. UOM Description<br />

Line Total<br />

Mechanical<br />

35<br />

31 23 36 00 0041 CY Grade And Compact Earthen Fill (0-500 CY) Note: Includes spreading,<br />

shaping, rough grading, cOmpaction, and water1ng <strong>of</strong> imported or stockpiled<br />

material by machine.<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

13.75 X<br />

3.33 X<br />

1.0100<br />

Contractors Note: Backfill and compact excavation after tie in.<br />

Total<br />

$46.25<br />

$46.25<br />

36<br />

33 11 13<br />

00 0006 LF a~ (20 em) Diameter Mechanical Joint, Ductile Iron Pipe<br />

$2,681.79<br />

Quantity Unit Price Factor<br />

Installation 52.00 X 36.48 X 1.0100<br />

Total<br />

$1,915.93<br />

Demolition 71.00 X 10.68 X 1.0100<br />

$765.86<br />

Contractors Note: Demo and remove existing a~ pipe after blowers are removed. New above ground aff pipe tied into existing<br />

piping below ground.<br />

37<br />

33 11 13<br />

00 0017 EA a" {20 em) Diameter Mechanical Joint, 90 Degree Ductile Iron Elbow<br />

$3,315.72<br />

Quantity Unit Price Factor Total<br />

Installation 5.00 X 571.43 X 1.0100 $2,885.72<br />

Demolition 7.00 X 60.a2 X 1.0100 $430.00<br />

Contractors Note: 8" 90 degree fitting for new piping. Remove 4 existing fittings prior to installing caps.<br />

38<br />

33 11 13<br />

00 0056 EA a" x a" Mechanical Joint Ductile Iron Tee<br />

$1,839.10<br />

Installation<br />

Quantity Unit Price Factor Total<br />

3.00 X 546.09 X 1.0100 $1,654.65<br />

Demolition 2.00 X 91.31 X 1.0100 $184.45<br />

Contractors Note: Tee fitting above ground for new pipe.<br />

39<br />

33 11 13<br />

00 0160 EA 8" X 6" Mechanical Joint Ductile Iron Reducer, Mechanical Joint X Mechanical<br />

Joint<br />

Quantity Unit Price Factor Total<br />

Installation 2.00 X 304.14 X 1.0100 $614.36<br />

$a75.79<br />

Demolition 4.00 X 64.71 X 1.0100 $261.43<br />

Contractors Note: Remove existing reducers during demo. Instal! reducer from a~ pipe to a~ connection on blowers.<br />

40<br />

33 11 13<br />

00 0252 EA a~ (20 em) Diameter Mechanical Joint Ductile Iron Cap<br />

$1,363.30<br />

Quantity Unit Price Factor Total<br />

Installation<br />

4.00 X 337.45 X 1.0100 $1,363.30<br />

Contractors Note: Cap existing 8" pipes above ground after existinb blowers are removed.<br />

41<br />

33 12 16<br />

00 0015 EA 6" Butterfly Valve, AWNA C504 Cast Iron Body, Iron Disc With HandwheeJ<br />

Operator<br />

Excludes Quantity Unit Price Factor Jotal<br />

Material<br />

Installation 2.00 X 277.13 X 1.0100 $559.80<br />

Demolition 4.00 X 138.56 X 1.0100 $559.78<br />

Contractors Note: Install shut <strong>of</strong>f valves at connection to new blowers. Labor only. Valve comes with new units according to<br />

submittal information.<br />

$1,119.59<br />

42<br />

33 12 16 00 0016 EA a" Butterfly Valve, AWNA C504 Cast Iron Body, Iron Disc With Handwheel<br />

Operator<br />

Installation<br />

Quantity<br />

2.00 X<br />

Unit Price<br />

1,550.63 X<br />

Factor<br />

1.0100<br />

Contractors Note: Shut <strong>of</strong>f valve on either side <strong>of</strong> the new above ground Tee fitting.<br />

Total<br />

$3,132.27<br />

$3,132.27<br />

Proposal Review Detail - Category<br />

Page 5 <strong>of</strong>6<br />

412512013