Proposal Review Detail • Category Continues ..<br />
Job Order Number: 015225.00<br />
Job Order Title: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>- aerobic digestor blowers<br />
Rec# CSI Number Mod. UOM Description<br />
Line Total<br />
Mechanical<br />
35<br />
31 23 36 00 0041 CY Grade And Compact Earthen Fill (0-500 CY) Note: Includes spreading,<br />
shaping, rough grading, cOmpaction, and water1ng <strong>of</strong> imported or stockpiled<br />
material by machine.<br />
Quantity<br />
Unit Price<br />
Factor<br />
Installation<br />
13.75 X<br />
3.33 X<br />
1.0100<br />
Contractors Note: Backfill and compact excavation after tie in.<br />
Total<br />
$46.25<br />
$46.25<br />
36<br />
33 11 13<br />
00 0006 LF a~ (20 em) Diameter Mechanical Joint, Ductile Iron Pipe<br />
$2,681.79<br />
Quantity Unit Price Factor<br />
Installation 52.00 X 36.48 X 1.0100<br />
Total<br />
$1,915.93<br />
Demolition 71.00 X 10.68 X 1.0100<br />
$765.86<br />
Contractors Note: Demo and remove existing a~ pipe after blowers are removed. New above ground aff pipe tied into existing<br />
piping below ground.<br />
37<br />
33 11 13<br />
00 0017 EA a" {20 em) Diameter Mechanical Joint, 90 Degree Ductile Iron Elbow<br />
$3,315.72<br />
Quantity Unit Price Factor Total<br />
Installation 5.00 X 571.43 X 1.0100 $2,885.72<br />
Demolition 7.00 X 60.a2 X 1.0100 $430.00<br />
Contractors Note: 8" 90 degree fitting for new piping. Remove 4 existing fittings prior to installing caps.<br />
38<br />
33 11 13<br />
00 0056 EA a" x a" Mechanical Joint Ductile Iron Tee<br />
$1,839.10<br />
Installation<br />
Quantity Unit Price Factor Total<br />
3.00 X 546.09 X 1.0100 $1,654.65<br />
Demolition 2.00 X 91.31 X 1.0100 $184.45<br />
Contractors Note: Tee fitting above ground for new pipe.<br />
39<br />
33 11 13<br />
00 0160 EA 8" X 6" Mechanical Joint Ductile Iron Reducer, Mechanical Joint X Mechanical<br />
Joint<br />
Quantity Unit Price Factor Total<br />
Installation 2.00 X 304.14 X 1.0100 $614.36<br />
$a75.79<br />
Demolition 4.00 X 64.71 X 1.0100 $261.43<br />
Contractors Note: Remove existing reducers during demo. Instal! reducer from a~ pipe to a~ connection on blowers.<br />
40<br />
33 11 13<br />
00 0252 EA a~ (20 em) Diameter Mechanical Joint Ductile Iron Cap<br />
$1,363.30<br />
Quantity Unit Price Factor Total<br />
Installation<br />
4.00 X 337.45 X 1.0100 $1,363.30<br />
Contractors Note: Cap existing 8" pipes above ground after existinb blowers are removed.<br />
41<br />
33 12 16<br />
00 0015 EA 6" Butterfly Valve, AWNA C504 Cast Iron Body, Iron Disc With HandwheeJ<br />
Operator<br />
Excludes Quantity Unit Price Factor Jotal<br />
Material<br />
Installation 2.00 X 277.13 X 1.0100 $559.80<br />
Demolition 4.00 X 138.56 X 1.0100 $559.78<br />
Contractors Note: Install shut <strong>of</strong>f valves at connection to new blowers. Labor only. Valve comes with new units according to<br />
submittal information.<br />
$1,119.59<br />
42<br />
33 12 16 00 0016 EA a" Butterfly Valve, AWNA C504 Cast Iron Body, Iron Disc With Handwheel<br />
Operator<br />
Installation<br />
Quantity<br />
2.00 X<br />
Unit Price<br />
1,550.63 X<br />
Factor<br />
1.0100<br />
Contractors Note: Shut <strong>of</strong>f valve on either side <strong>of</strong> the new above ground Tee fitting.<br />
Total<br />
$3,132.27<br />
$3,132.27<br />
Proposal Review Detail - Category<br />
Page 5 <strong>of</strong>6<br />
412512013