Job Order Contract<br />

Proposal Review Detail- Category<br />

Date:<br />

Contract Number:<br />

Job Order Number:<br />

Job Order Title:<br />

April25, 2013<br />

11-082<br />

015225.00<br />

<strong>Village</strong> <strong>of</strong> <strong>Huntley</strong> - aerobic digestor blowers<br />

Contractor:<br />

F. H. Paschen, S. N. Nielsen & Associates LLC<br />

Proposal Value: $100,589.48<br />

Proposal Name: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>- Aerobic Digester Blowers<br />

Proposal Submitted: 04/24/2013<br />

Adjustment Factor(s) Used: 1.0000-No Adjustment, 1.0100-Phase 1 Normal Working Hours, 1.0500-Phase 1 Non Pre-Priced<br />

Rec# CSI Number Mod. UOM<br />

Electric<br />

Description<br />

Line Total<br />

01 22 16 00 0002 EA Reimbursable Fees Note: Reimbursable Fees will be paid to the contractor for<br />

the actual cost <strong>of</strong> all permits, without mark-up, for which a receipt or bill is<br />

received. The Adjustment Factor applied to Reimbursable Fees will be 1.0000.<br />

The labor cost involved in obtaining all permits Is in the Adjustment Factor.<br />

The base cost <strong>of</strong> the Reimbursable Fee is $1.00. The quantity used will adjust<br />

the base cost to the actual Reimbursable Fee (e.g. quantity <strong>of</strong> 125 = $125.00<br />

Reimbursable Fee). If there are multiple Reimbursable Fees, each one shall<br />

be fisted separately with a comment in the ~note~ block to identify the<br />

Reimbursable Fees {e.g. sidewalk closure, road cut, various permits, extended<br />

warrantee, expedited shipping costs, etc.). A copy <strong>of</strong> each receipt shall be<br />

included with the Proposal.<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

0.00 X<br />

1.00 X<br />

1.0000<br />

Contractors Note: Reimbursable fee for any bonds, permits fees, or engineered drawings that may be required by <strong>Huntley</strong>.<br />

Total<br />

$0.00<br />

$0.00<br />

2<br />

01 51 13 00 0005 EA Temporary 200 A, 240 V, NEMA 3R Service Switch Or Building Feeder Switch<br />

With Fuses<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

1.00 X 1,387.67 X 1.0100<br />

Demolition<br />

1.00 X<br />

391.53 X 1.0100<br />

Total<br />

$1,401.55<br />

$395.45<br />

$1,796.99<br />

Contractors Note: Set up temporary power supply to blowers so underground wires can be removed and replaced.<br />

3<br />

05 05 23 00 0177 EA 3W Diameter x 5~ Long Concrete Strike Anchor<br />

$99.38<br />

Quantity<br />

Unit Price<br />

Installation 8.00 X 12.30 X<br />

Contractors Note: Concrete anchors for mounting unistrut rack to concrete wall.<br />

Factor<br />

1.0100<br />

Total<br />

$99.38<br />

4<br />

23 09 23 00 0037 EA<br />

Install And Wire Connection To VFD<br />

'$701.83<br />

Quantity<br />

Installation<br />

2.00 X<br />

Contractors Note: Connect power cable to VDF's.<br />

Unit Price<br />

347.44<br />

X<br />

Factor<br />

1.0100<br />

Total<br />

$701.83<br />

5<br />

26 05 13 00 0004 MLF #6 AWG Cable, XLP, 5 KV, Placed In Conduit, Shielded, Single Conductor<br />

$1,334.32<br />

lnstallalion<br />

Demolition<br />

Quantity<br />

0.40<br />

0.40<br />

X<br />

X<br />

Unit Price<br />

2,751.88<br />

550.88<br />

X<br />

X<br />

Factor<br />

1.0100<br />

1.0100<br />

To_tal<br />

$1,111.~6<br />

$222.56<br />

Contractors Note:<br />

6<br />

26 05 13<br />

00 0007 MLF #1/0 AWG Cable, XLP, 5 KV, Placed In Conduit, Shielded, Single Conductor<br />

$7,689.09<br />

Quantity Unit Price Factor<br />

Installation<br />

1.22 X 5,402.82 X 1.0100<br />

Demolition 1.22 X 837.31 X 1.0100<br />

Total<br />

$6,657.35<br />

$1,031.73<br />

Contractors Note: Demo existing power cable.<br />

Proposal Review Detail -Category<br />

Page 1 <strong>of</strong>S<br />

4/25/2013