15.01.2014 Views

Included - Village of Huntley

Included - Village of Huntley

Included - Village of Huntley

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Proposal Review Detail • Category Continues ..<br />

Job Order Number: 015225.00<br />

Job Order Title: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>- aerobic digestor blowers<br />

Rec# CSI Number Mod. UOM Description<br />

Line Total<br />

Electric<br />

7<br />

26 05 13 00 0184 EA #6 To 4/0 AWG Cable Termination Without Stress Cone, Medium Voltage To 5<br />

KV<br />

Installation<br />

Quantity<br />

28.00 X<br />

Unit Price<br />

184.38 X<br />

Factor<br />

1.0100<br />

Contractors Note: Perform power cable terminations and tie ins at blowers and new main breaker buckets.<br />

Total<br />

$5,214.27<br />

$5,214.27<br />

8<br />

26 05 19 00 0354 EA 75 HP AC Motor Three Phase, 460 V Motor/Equipment, Connection,<br />

Termination And Rotation Testing<br />

Installation<br />

Quantity<br />

2.00 X<br />

Unit Price<br />

383.37 X<br />

Factor<br />

1.0100<br />

Contractors Note: Start up and comissioning <strong>of</strong> each VFD.<br />

Total<br />

$774.41<br />

$774.41<br />

9<br />

26 05 19 00 0375 MLF #12 AWG Cable- XLP {XHHW}, 600 V, Single Stranded, Placed In Conduit<br />

$1,156.54<br />

Installation<br />

Demolition<br />

Quantity<br />

1.22<br />

1.22<br />

X<br />

X<br />

Unit Price<br />

743.31<br />

195.29<br />

X<br />

X<br />

Factor<br />

1.0100<br />

1.0100<br />

Total<br />

$915.91<br />

$240.64<br />

Contractors Note: Low voltage wiring between blowers and VFD's<br />

10<br />

26 05 19 00 0376 MLF #10 AWG Cable- XLP (XHHW), 600 V, Single Stranded, Placed In Conduit<br />

$1,403.50<br />

lnsta11ation<br />

Demolition<br />

Quantity<br />

1.22<br />

1.22<br />

X<br />

X<br />

Unit Price<br />

915.84<br />

223.18<br />

X<br />

X<br />

Factor<br />

1.0100<br />

1.0100<br />

Total<br />

$1,128.50<br />

$275.00<br />

ContraCtors Note: Control wiring bet>Neen blowers and YFD's<br />

11<br />

26 05 29 00 0006 LF<br />

1-5/a~ Wide x 13/16rt High, 12 Gauge, Steel Unlstrut Channel<br />

$383.60<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

30.00 X<br />

12.66 X<br />

1.0100<br />

Contractors Note: Unistrut rack for mounting VFD's on interior wall, and for mounting conduit.<br />

Total<br />

$383.60<br />

12<br />

26 05 29 00 0026 EA 3-Hole, Z-Bracket, Unistrut Channel Fitting<br />

$59.47<br />

Quantity<br />

Unit Price<br />

Installation 8.00 x 7.36<br />

X<br />

Factor<br />

1.0100<br />

Total<br />

$59.47<br />

Contractors Note: Mounting hardware for unistrut racks.<br />

13<br />

26 05 29 00 0034 EA 2-112'' Diameter, Rigid Steel Conduit Clamp For Unistrut Channel<br />

$65.21<br />

Installation<br />

Quantity<br />

12.00 X<br />

Contractors Note: Conduit clamps for mounting<br />

Unit Price<br />

5.38<br />

X<br />

Factor<br />

1.0100<br />

Total<br />

$65.21<br />

14<br />

26 05 29 00 0045 EA<br />

1/2-13 Lock Nut With Spring For Unislrut Channel<br />

$68.24<br />

Quantity<br />

Unit Price<br />

Installation<br />

12.00 X<br />

5.63<br />

Contractors Note: Fastener for unistrut channel supports and racks<br />

X<br />

Factor<br />

1.0100<br />

Total<br />

$68.24<br />

15<br />

26 05 33 00 0468 LF 1-1/4~ RGS Conduit With Coupling, Mounted Exposed On Flat Wall<br />

$336.94<br />

Installation<br />

Quantity<br />

40.00 X<br />

Contractors Note: Conduit installed inside electric building.<br />

Unit Price<br />

8.34 X<br />

Factor<br />

1.0100<br />

Total<br />

$336.94<br />

16<br />

26 05 33 00 0471 LF 2-1/2" RGS Conduit With Coupling, Mounted Exposed On Flat Wall<br />

$724.78<br />

Installation<br />

Quantity<br />

40.00 X<br />

Unit Price<br />

17.94 X<br />

Contractors Note: 2-112" conduit installed inside electric building.<br />

Factor<br />

1.0100<br />

Total<br />

$724.78<br />

Proposal Review Detail - Category<br />

Page2 <strong>of</strong>S<br />

4/25/2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!