Proposal Review Detail ~ Category Continues ..<br />

Job Order Number: 015225.00<br />

Job Order Title: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong> • aerobic digestor blowers<br />

Rec# CSI Number Mod. UOM Description<br />

Line Total<br />

Mechanical<br />

26<br />

27<br />

28<br />

01 22 23 00 0475 DAY 50 To 55 Ton Lift Hydraulic Crane With Full· Time Operator<br />

Quantity<br />

Unit Price<br />

Installation 2.00 x 1,885.08 x<br />

Factor<br />

1.0100<br />

Total<br />

$3,807.86<br />

Contractors Note: Crane on site for two days. First mobilization to remove two existing blowers and set one new blower. Once<br />

first new blower Is operational, remaining blowers will be removed and 2nd new blower will be installed.<br />

01 22 23 00 0734 DAY<br />

lnstal!ation<br />

3 Ton, 4 x 2 Flat Bed Truck With Full-Time Truck Driver<br />

Quantity<br />

2.00 X<br />

Unit Price<br />

924.81 X<br />

Factor<br />

1.0100<br />

Total<br />

$1,868.12<br />

Contractors Note: Flat bed truck on site during both crane mobilizations. Removed blowers will be lifted and set directly on truck<br />

for removal from site. Includes hauling and disposal <strong>of</strong> old units.<br />

01 45 23 00 0160 GAL Hydrostatic Pressure Testing Of Air Receiving Tanks, 21 To 120 Gallon<br />

Quantity Unit Price Factor<br />

Installation 240 . 00 x 4.56 x 1.0100 =<br />

Contractors Note: Use for pressure testing <strong>of</strong> new and existing pipe after installation per owner request. 120 x 2 = 240<br />

Total<br />

$1,105.34<br />

$3,807.86<br />

$1,868.12<br />

$1,105.34<br />

29<br />

01 71 13 00 0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor<br />

Trailer With Up To 53' Bed Note: For equipment such as bulldozers, motor<br />

scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy<br />

duty construction loaders, tractors, pavers, rollers, bridge finishers, straight<br />

mast construction forklifts, telescoping boom rough terrrain construction<br />

forklifts, telescoping and articulating boom manlifts with > 40' boom lengths,<br />

etc.<br />

Installation<br />

Quantity<br />

1.00 X<br />

Unit Price<br />

402.63 X<br />

Factor<br />

1.0100<br />

Contractors Note: Mobilization <strong>of</strong> excavator.<br />

Total<br />

$406.66<br />

$406.66<br />

30<br />

01 71 13 00 0007 EA<br />

40 To 50 Ton Lift Move On/Off Cost, Truck Mounted Crane<br />

$1,031.45<br />

Quantity<br />

Installation<br />

2.00 X<br />

Contractors Note: Mob!lize crane to jobsite two limes.<br />

Unit Price<br />

510.62 X<br />

Factor<br />

1.0100<br />

Total<br />

$1,031.45<br />

31<br />

22 11 16 00 0360 EA<br />

Cut And Prepare 8" (21 em) Pipe<br />

$74.72<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

2.00 X<br />

36.99 X<br />

1.0100<br />

Contractors Note: Cut and prep existing below- ground pipe for Installation <strong>of</strong> new Tee connection.<br />

Total<br />

$74.72<br />

32<br />

22 15 19 19 0013<br />

Excludes<br />

Material<br />

EA 75 HP, 320 SCFM Rotary Screw Air Compressor With Enclosure, 125 PSIG<br />

Max Discharge Pressure, Lubricated<br />

Quantity<br />

Unit Price<br />

Factor<br />

Installation<br />

2.00 X 4,169.18 X<br />

1.0100<br />

Contractors Note: Install two new 75 HP blowers supplied by <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>. Does not include material. DOES NOT<br />

INCLUDE DEMO OF OLD BLOWER UNITS. DEMO AND REMOVAL OF BLOWERS BY OWNER.<br />

Total<br />

$8,421.74<br />

$8,421.74<br />

33<br />

31 23 36 00 0007 CY<br />

Excavation By Hand Up To 1 On 4 Slope<br />

$62.67<br />

Quantity<br />

Installation<br />

1.00 X<br />

Contractors Note: Hand dig around existing piping.<br />

Unit Price<br />

62.05 X<br />

Factor<br />

1.0100<br />

Total<br />

$62.67<br />

34<br />

31 23 36 00 0010 CY Excavation Around Buried Structures To Remain Up To Depth Of 4'<br />

$80.55<br />

Quantity Unit Price Factor<br />

Installation 12 . 50 x 6.38 x 1.0100<br />

Total<br />

$80.55<br />

Contractors Note: Excavation to uncover existing pipes.<br />

Proposal Review Detail ·Category<br />

Page 4 <strong>of</strong>6<br />