Proposal Review Detail ~ Category Continues ..<br />
Job Order Number: 015225.00<br />
Job Order Title: <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong> • aerobic digestor blowers<br />
Rec# CSI Number Mod. UOM Description<br />
Line Total<br />
Mechanical<br />
26<br />
27<br />
28<br />
01 22 23 00 0475 DAY 50 To 55 Ton Lift Hydraulic Crane With Full· Time Operator<br />
Quantity<br />
Unit Price<br />
Installation 2.00 x 1,885.08 x<br />
Factor<br />
1.0100<br />
Total<br />
$3,807.86<br />
Contractors Note: Crane on site for two days. First mobilization to remove two existing blowers and set one new blower. Once<br />
first new blower Is operational, remaining blowers will be removed and 2nd new blower will be installed.<br />
01 22 23 00 0734 DAY<br />
lnstal!ation<br />
3 Ton, 4 x 2 Flat Bed Truck With Full-Time Truck Driver<br />
Quantity<br />
2.00 X<br />
Unit Price<br />
924.81 X<br />
Factor<br />
1.0100<br />
Total<br />
$1,868.12<br />
Contractors Note: Flat bed truck on site during both crane mobilizations. Removed blowers will be lifted and set directly on truck<br />
for removal from site. Includes hauling and disposal <strong>of</strong> old units.<br />
01 45 23 00 0160 GAL Hydrostatic Pressure Testing Of Air Receiving Tanks, 21 To 120 Gallon<br />
Quantity Unit Price Factor<br />
Installation 240 . 00 x 4.56 x 1.0100 =<br />
Contractors Note: Use for pressure testing <strong>of</strong> new and existing pipe after installation per owner request. 120 x 2 = 240<br />
Total<br />
$1,105.34<br />
$3,807.86<br />
$1,868.12<br />
$1,105.34<br />
29<br />
01 71 13 00 0003 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor<br />
Trailer With Up To 53' Bed Note: For equipment such as bulldozers, motor<br />
scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy<br />
duty construction loaders, tractors, pavers, rollers, bridge finishers, straight<br />
mast construction forklifts, telescoping boom rough terrrain construction<br />
forklifts, telescoping and articulating boom manlifts with > 40' boom lengths,<br />
etc.<br />
Installation<br />
Quantity<br />
1.00 X<br />
Unit Price<br />
402.63 X<br />
Factor<br />
1.0100<br />
Contractors Note: Mobilization <strong>of</strong> excavator.<br />
Total<br />
$406.66<br />
$406.66<br />
30<br />
01 71 13 00 0007 EA<br />
40 To 50 Ton Lift Move On/Off Cost, Truck Mounted Crane<br />
$1,031.45<br />
Quantity<br />
Installation<br />
2.00 X<br />
Contractors Note: Mob!lize crane to jobsite two limes.<br />
Unit Price<br />
510.62 X<br />
Factor<br />
1.0100<br />
Total<br />
$1,031.45<br />
31<br />
22 11 16 00 0360 EA<br />
Cut And Prepare 8" (21 em) Pipe<br />
$74.72<br />
Quantity<br />
Unit Price<br />
Factor<br />
Installation<br />
2.00 X<br />
36.99 X<br />
1.0100<br />
Contractors Note: Cut and prep existing below- ground pipe for Installation <strong>of</strong> new Tee connection.<br />
Total<br />
$74.72<br />
32<br />
22 15 19 19 0013<br />
Excludes<br />
Material<br />
EA 75 HP, 320 SCFM Rotary Screw Air Compressor With Enclosure, 125 PSIG<br />
Max Discharge Pressure, Lubricated<br />
Quantity<br />
Unit Price<br />
Factor<br />
Installation<br />
2.00 X 4,169.18 X<br />
1.0100<br />
Contractors Note: Install two new 75 HP blowers supplied by <strong>Village</strong> <strong>of</strong> <strong>Huntley</strong>. Does not include material. DOES NOT<br />
INCLUDE DEMO OF OLD BLOWER UNITS. DEMO AND REMOVAL OF BLOWERS BY OWNER.<br />
Total<br />
$8,421.74<br />
$8,421.74<br />
33<br />
31 23 36 00 0007 CY<br />
Excavation By Hand Up To 1 On 4 Slope<br />
$62.67<br />
Quantity<br />
Installation<br />
1.00 X<br />
Contractors Note: Hand dig around existing piping.<br />
Unit Price<br />
62.05 X<br />
Factor<br />
1.0100<br />
Total<br />
$62.67<br />
34<br />
31 23 36 00 0010 CY Excavation Around Buried Structures To Remain Up To Depth Of 4'<br />
$80.55<br />
Quantity Unit Price Factor<br />
Installation 12 . 50 x 6.38 x 1.0100<br />
Total<br />
$80.55<br />
Contractors Note: Excavation to uncover existing pipes.<br />
Proposal Review Detail ·Category<br />
Page 4 <strong>of</strong>6<br />
4/25/2013