Included - Village of Huntley
Included - Village of Huntley
Included - Village of Huntley
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
ESTIMATE OF FEE<br />
CBBEL estimates the following fees for each <strong>of</strong> the tasks described above:<br />
Task 1 - Preconstruction Services<br />
Task 2- Submittal Review<br />
Task 3- Construction Observation<br />
Task 4- Layout Verification<br />
Task 5- Material Inspection<br />
Task 6- Record Drawings<br />
Task 7- Project Documentation<br />
Task 8- Project Closeout<br />
Task 9- NPDES Compliance<br />
Direct Costs<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
$<br />
SUBTOTAL $<br />
$<br />
TOTAL $<br />
3,650.00<br />
15,100.00<br />
249,350.00<br />
5,300.00<br />
18,539.00<br />
4,700.00<br />
51,200.00<br />
31,000.00<br />
12,000.00<br />
390,839.00<br />
4,950.00<br />
395,789.00<br />
The above estimated fees will be billed to the <strong>Village</strong> on a time and materials basis, not to<br />
exceed the above total. CBBEL will utilize the rates in our Master Agreement for billing<br />
purposes.<br />
If this proposal meets with your approval, please sign and return one copy <strong>of</strong> this proposal<br />
as an indication <strong>of</strong> acceptance and notice to proceed. Please feel free to contact us<br />
anytime.<br />
Sincerely,<br />
Christopher B. Burke, PhD, PE, D.WRE, Dist.M.ASCE<br />
President<br />
THIS PROPOSAL ACCEPTED FOR THE VILLAGE OF HUNTLEY.<br />
BY:<br />
TITLE:<br />
DATE:<br />
GJS/gjs<br />
N:\PROPOSALS\ADMIN\2013\Hunt!ey- Kreutzer Road.050313.doc<br />
Page 6 <strong>of</strong>6