Synthesis Report - European Commission - Europa
Synthesis Report - European Commission - Europa
Synthesis Report - European Commission - Europa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Synthesis</strong> <strong>Report</strong> Ex-post Evaluation of the ERDF 2000-2006<br />
Table 1.10 Division of ERDF in Objective 1 NUTS 3 regions in the EU15 by region type and division<br />
of population, 2000-2006<br />
Funding<br />
Population<br />
EUR million % Total % Country % Total in Obj 1<br />
BE Urban 380 89 85 82<br />
Intermed, near a city 47 11 12 18<br />
DE Urban 4652 38 57 42<br />
Intermed, near a city 4783 39 29 37<br />
Rural, near a city 2742 23 13 22<br />
IE Urban 516 27 28 28<br />
Rural, near a city 798 41 44 44<br />
Rural, remote 633 33 28 28<br />
GR Urban 4570 30 36 36<br />
Intermed, near a city 3450 23 24 24<br />
Intermed, remote 622 4 3 3<br />
Rural, near a city 768 5 6 6<br />
Rural, remote 5742 38 31 31<br />
ES Urban 4501 18 45 22<br />
Intermed, near a city 13271 52 38 52<br />
Intermed, remote 1851 7 4 7<br />
Rural, near a city 2780 11 8 10<br />
Rural, remote 2956 12 6 9<br />
FR Urban 1584 64 30 80<br />
Intermed, near a city 582 24 54 12<br />
Rural, near a city 237 10 13 4<br />
Rural, remote 63 3 4 3<br />
IT Urban 5148 32 54 38<br />
Intermed, near a city 7215 45 34 43<br />
Intermed, remote 723 5 3 5<br />
Rural, near a city 1950 12 7 9<br />
Rural, remote 882 6 3 6<br />
NL Intermed, near a city 82 100 16 100<br />
AT Rural, near a city 182 100 35 100<br />
PT Urban 5103 39 52 52<br />
Intermed, near a city 4298 32 27 27<br />
Rural, near a city 736 6 6 6<br />
Rural, remote 3094 23 15 15<br />
FI Rural, near a city 184 37 34 57<br />
Rural, remote 315 63 20 43<br />
SE Urban 7 1 21 37<br />
Intermed, near a city 0 0 30 30<br />
Rural, near a city 146 30 30 10<br />
Rural, remote 337 69 20 23<br />
UK Urban 2795 70 70 62<br />
Intermed, near a city 439 11 27 18<br />
Intermed, remote 349 9 1 9<br />
Rural, near a city 226 6 1 7<br />
Rural, remote 161 4 1 5<br />
EU15 Urban 29200 32 51 39<br />
Intermed, near a city 34236 37 33 34<br />
Intermed, remote 3529 4 1 3<br />
Rural, near a city 10784 12 10 13<br />
Rural, remote 14150 15 5 11<br />
Source: Based on database of commitments up to end-2006 by NUTS 3 region constructed by SWECO for DG Regio<br />
Such a concentration was particularly evident in regions remote from a city, which tend to be<br />
peripheral. These regions accounted for under 5% of the EU15 population but received just over<br />
15% of ERDF support, over three times as much. Regions which were rural but closer to a large<br />
town or city also received a larger share of ERDF funding (almost 12%) than their share of<br />
population (10%), but the difference between the two was much smaller.<br />
34