06.03.2014 Views

paraffin wax deposition and fouling

paraffin wax deposition and fouling

paraffin wax deposition and fouling

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

— 53<br />

capable of Coat ining the entire contents of the circulation loon,<br />

in cane the tank onrang a leaks<br />

A<br />

t:rmostat was fitted in the holc.ing tank, activating the<br />

zalety system if excessive temneratures were reached, indicaaLng a<br />

The return rires entering the holding tank ‘iere carried do:rn<br />

to within a few cm<br />

static electricity<br />

of the tank floor, minimizing the rroduc;ion of<br />

areventing excessive mixing of the exsernentai<br />

solution.<br />

An<br />

electric eye level detector was fitted to the level indicator<br />

o: one ncatia zanc, i a s:oon_age occurree, Inc soactaon ev in<br />

one tan won_s eror, pass one eectrtc eye <strong>and</strong> act:vate tne Sãt oy<br />

system.<br />

All olnework was nressure tested. The entire annaratus insie<br />

the building was rut inside a mild steel barrier, carahe o±<br />

contain<br />

ing the entire contents 0f the circulation iOO<br />

2 in case of eakage<br />

A<br />

tnermistor was instalThd at the top of tne exrerimenton r:g<br />

to detect any undue rise in temrerature inside the building. :t<br />

would activate the safety system.<br />

An orifice was installed on the rump discharge side <strong>and</strong><br />

connected to a mercury electrode manometer.<br />

n the event of a<br />

blockage or nuar failure, the lack of differential rressure across<br />

tae ora:ace wons activate the safety systems<br />

tne entire arraraons was care:uLy eartacS to prevent one<br />

formation o static electricity <strong>and</strong> spark ignition.<br />

The<br />

safety svste: was essentially a groan of relays cconDcton<br />

in seraes on one was rtcrec. ouD on ;ne event oc a lire, :a__<br />

tank level, blockage or man failure, in would stop the nuar<br />

2O seconds ater, close the soenoid valve or. the tuna discharge<br />

side.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!