paraffin wax deposition and fouling
paraffin wax deposition and fouling
paraffin wax deposition and fouling
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
exce-ot the one between the holding tank <strong>and</strong> the circulation rumr,<br />
<strong>and</strong> the electrode manometer shorted out. with all valves closed<br />
To start the circulation pumn the safety system was turned on<br />
switched on <strong>and</strong> allowed to warm u1.<br />
Tue uressure transaucer power supriy ama its recorder were<br />
could be started.<br />
the designed bulk solution temDerature was reached, the test sections<br />
Cnce it was clear Lhat no blockares were in the ni-oeork anu that<br />
with the inlet uiZre to the desined valve <strong>and</strong> the coolia:: uter<br />
manifdll. The Jll-.’:ra-; th:oan the test sectiom’.’as then attst5d<br />
tuts aci:es ac eymass Inc ona..ace meter cy osmg tnre’ign an-c<br />
:ean:fo_s to ate atuen ssce o tue ors:sce meter. ne so_utson as<br />
arcr across tue ors:sce meter was uses to c_ear tue _sne :rcm tue<br />
rressare. nce imiat was LDrie, tue a.rasn c.oses, ann tue :ressuro<br />
was great emoug:. to clear tuat ran of tue _sne, agaInst athos::ner:c<br />
manifoll, Tue rressare on the arrroach side of the orifice meter<br />
having a arain on the llme close to the rressume transducer<br />
had a solidified ecoerimentnl solution in them. This was done by<br />
rressure tarrangs were c_earec oust as tue masn Pipe’cr tney<br />
outlet valves had been opened, the lines from the orifice meter<br />
The test sections were startea simgy. hen the irZet ant<br />
this oeration,<br />
tes’Dera;ure, The tem-cerature recormer was swstcuea on to :ecnator<br />
vave aria the system auowed to reacu tue cesignea. ouk so_utson<br />
Tue ten:perauure controller was then set to tne dessgnea.<br />
now under the control of the safety system.<br />
electrode manometer could be removed. The circulktion system ‘ias<br />
-oressure across tue orafsce meter ama. the snort carcuat across tue<br />
was now flowing through the bypass lime. There was a iifferen;al<br />
its<br />
discharge side <strong>and</strong><br />
the bypass valve were orened. The solution<br />
the puar was startea \iuen ; nan run up to smeea, tue vave on<br />
— 35 —