Western Railway - Indian Railway
Western Railway - Indian Railway
Western Railway - Indian Railway
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Tender No.<br />
S&T/BRC/12-13/03 (Signal)<br />
DOWN LOADED FROM INTERNET<br />
no Tender which is received after the time and date specified above shall<br />
ordinarily be considered. <strong>Railway</strong> will not be responsible for delays by<br />
Department of Posts or any other reasons.<br />
2.11 SYSTEM OF QUOTING RATES<br />
The entire work is to be done as per ―Schedule of Material & Work‖ and<br />
―Technical Specification & Requirements‖.<br />
(a) The entire work is divided into the following two schedules:-<br />
Schedule ‗A‘—Supply of material.<br />
Schedule ‗B‘---Execution.<br />
(b) Against each item of Schedules, the estimated rates of <strong>Railway</strong>s are<br />
mentioned and total is drawn for each schedule ‗A‘ & ‗B‘. The Estimated<br />
grand total for Schedule ‗A‘ & ‗B‘ of the station put together is drawn.<br />
Tenderer are requested to quote the percentage above / below /at par<br />
the <strong>Railway</strong>s estimated grand total at which he offers to do the work<br />
covered under schedule „A‟ & „B‟ together.<br />
(c) Tenderer must sign along with seal on all pages of their offer.<br />
(d) All corrections and over writing must be signed / attested.<br />
Tenderers while quoting may specifically note the following:-<br />
(i)<br />
The rates quoted in the offer by the tenderer shall be inclusive of basic cost<br />
and all taxes / duties (Excise & customs duty, sales tax, interstate tax, works<br />
contract tax, transport, loading, unloading charge, Octroi etc.) as applicable<br />
at present.<br />
(ii) Road Permit will be issued by the <strong>Railway</strong>s on demand.<br />
(iii) Concessional forms ―D‖ will not be issued by <strong>Railway</strong> as per latest policy.<br />
(iv) <strong>Railway</strong>s will affect recovery of Sales Tax on work contract at source at the<br />
rate prevailing as per State Government Sales Tax in force, where the work<br />
is being executed.<br />
(v) <strong>Railway</strong>s shall affect recovery of income tax at source at the rates in vogue.<br />
(vi) The rates quoted by tenderer and accepted by <strong>Railway</strong> Administration shall<br />
hold good till the Completion of the work and no additional individual claim<br />
will be admissible on account of fluctuation in market rates, increase in<br />
taxes/any other levies/toll etc.<br />
Further, no cognizance will be given for any sort of fluctuations in taxes and other<br />
market conditions etc. for any individual items for the purpose of making<br />
adjustments in payments.<br />
2.12 VALIDITY OF OFFER<br />
(i) The tenderer shall keep the offer open for a minimum period of 90 days<br />
from the date of opening of tender. Within that period, the tenderer cannot<br />
For Sr. Divisional Signal & Telecom Engineer Page 14 of 68 Signature of Tenderer & Seal<br />
For and on behalf of President of India