Tender No.<br />

S&T/BRC/12-13/03 (Signal)<br />

DOWN LOADED FROM INTERNET<br />

The Contractor/s shall not be entitled to make any claim whatsoever against the<br />

<strong>Railway</strong> under or by virtue of or arising out of this contract, nor shall the <strong>Railway</strong><br />

entertain or consider any such claim, if made by the contractor/s after he/they<br />

would have signed a `No Claim Certificate' in favour of the <strong>Railway</strong>, in such<br />

form as shall be required by the <strong>Railway</strong>/s after the works are finally measured<br />

up. The Contractor/s shall be debarred from disputing the correctness of the<br />

items covered by ―No Claim Certificate" or demanding a reference to arbitration,<br />

in respect thereof. After clear no claim as given by contractor the dispute, if any<br />

will not be arbitrable.<br />

The provision of Clauses 63 & 64 to the General Condition of Contract will be<br />

applicable only for settlement of claims or disputes between the parties for<br />

values less than or equal to 20% of the value of the contract, and when claim or<br />

disputes are of value more than 20% of the contract, provision of Clauses 63 &<br />

64 and other relevant clauses of the General Conditions of Contract will not be<br />

applicable and arbitration will not be a remedy for settlement of such disputes.<br />

The contractor shall not be entitled to ask for reference to arbitration, before the<br />

completion of the work assigned to him / them under this contract. The<br />

contractor/s shall seek reference to arbitration to settle disputes only once within<br />

the ambit of above condition.<br />

If any dispute arises between the parties with respect to this agreement any<br />

application or suite shall be instituted only in the court with local unit of whose<br />

jurisdiction the <strong>Western</strong> <strong>Railway</strong> HQ office is situated and both the parties shall<br />

be bound by this clause.<br />

Relevant provisions of GCC in this regard as under:<br />

GCC Clause 63 :Matters finally determined by the <strong>Railway</strong>:-All disputes and<br />

differences of any kind whatsoever arising out of or in connection with the<br />

contract, whether during the progress of the work or after its completion and<br />

whether before or after the determination of the contract shall be referred by the<br />

Contractor to the <strong>Railway</strong> and the <strong>Railway</strong> shall within 120 days after receipt of<br />

the Contractor's representation make and notify decisions on all matters referred<br />

to by the contractor in writing provided that matters for which provisions has been<br />

made in Clause 8, 18, 22(5), 39, 43(2), 45(a), 55, 55-A(5), 57, 57-A, 61(1), 61(2)<br />

and 62(i) to (xiii)(B) of the General Conditions of Contract or in any clause of the<br />

Special Conditions of Contract shall be deemed as ―excepted matters‖ and the<br />

decisions of the <strong>Railway</strong> authority, thereon shall be final and binding on the<br />

Contractor provided further that ―excepted matters‖ shall stand specifically<br />

excluded from the purview of the arbitration clause and not be referred to<br />

Arbitration.<br />

GCC Clause 64:<br />

64.(1)(i) Demand for Arbitration: In the event of any dispute or difference<br />

between the parties here to as to the construction or operation of this<br />

contract, or the respective rights and liabilities of the parties on any<br />

matter in question, dispute or difference on any account or as to the<br />

withholding by the <strong>Railway</strong> of any certificate to which the contractor<br />

may claim to be entitled to, or if the <strong>Railway</strong> fails to make a decision<br />

within 120 days, then and in any such case, but except in any of the<br />

―excepted matters‖ referred to in clause 63 of these conditions, the<br />

For Sr. Divisional Signal & Telecom Engineer Page 38 of 68 Signature of Tenderer & Seal<br />

For and on behalf of President of India