Tender No.<br />

S&T/BRC/12-13/03 (Signal)<br />

DOWN LOADED FROM INTERNET<br />

i) The road vehicles will play only between sunrise and sunset.<br />

ii)<br />

Nominated vehicles and drivers will be utilized for work in the presence of at<br />

least one flagmen and one supervisor certified for such work.<br />

iii) The vehicles shall ply 6m clear of track. Any movement/work at less than<br />

6m and up to minimum 3.5m clear of track centre shall be done only in the<br />

presence of <strong>Railway</strong> employee authorized by the Engineer-in-charge. No<br />

part of the road vehicle will be allowed at less than 3.5m from track centre.<br />

Cost of such <strong>Railway</strong> employee shall be borne by the <strong>Railway</strong>.<br />

iv) The Contractor shall remain fully responsible for ensuring safety and in case<br />

of any accident, shall bear, cost of all damages to his equipment and men<br />

and also damages to railway and its passengers.<br />

v) The vehicles and equipments of contractors can be drafted by <strong>Railway</strong><br />

administration in case of accidents / natural calamities involving human<br />

lives.<br />

Engineer-in-charge may impose any other condition necessary for a<br />

particular work or site.<br />

4.34 EMERGENCY WORKS<br />

In the event of any accident or failure occurring in or about the work or arising out<br />

of or in connection with the construction, completion or maintenance of the works<br />

which in the opinion of the Engineer requires immediate attention, the <strong>Railway</strong><br />

may bring its own workmen or other agency to execute or partly execute the<br />

necessary work or carry out repairs if the Engineer considers that the<br />

contractor/s is/are not in a position to do so in time and charge the cost thereof ,<br />

as to be determined by the Sr. Divisional Signal & Telecommunication Engineer<br />

to the contractor.<br />

4.35 NIGHT WORKS<br />

Notwithstanding the provision in the General Conditions of Contract, if the<br />

Engineer is satisfied that the work is not likely to be completed in time, except by<br />

resorting to night work, he may order the contractor/s to carry out the works even<br />

at night without conferring any right on the contractor for claiming any extra<br />

payment for the same. The contractor at his own cost shall make all adequate<br />

lighting arrangements and shall take precautions to avoid any mishap during<br />

night.<br />

4.36 MAINS POWER SUPPLY<br />

Testing of installation / equipments shall be done under supervision of <strong>Railway</strong><br />

officials or by <strong>Railway</strong> officials themselves, from the electric supply to be<br />

provided by the <strong>Railway</strong>s. However, for any installation activity, like drilling,<br />

soldering etc., contractor, if so desires, to use tools / machines, electric power<br />

supply (230V) can be arranged by the <strong>Railway</strong>s on usual payment, as per extant<br />

procedure.<br />

For Sr. Divisional Signal & Telecom Engineer Page 36 of 68 Signature of Tenderer & Seal<br />

For and on behalf of President of India